Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />AU G ;~ J 1932 U^5"~~ <br />a I S° a b~~~~ <br />T0: Ben Young b~"~ ~ ~ ,o~by~n <br />FROM: Charl es Harri so~ ; i/ ^ ~~ Y~~h r~ ~~ '") <br />SUBJECT: Blue Ribbon'Mne TA - Waste and Spo~l Stabiliza ion <br />i ~ <br />The Blue Ribbon~Goal~ y has not as yet provided a geotec fiical analysis <br />to assure ih~t the mine bench and haul road can be reclaimed in a stable <br />manner. owever, the Company has committed to performing the geotechnical <br />analysis and the MLRD has included a stipulation requiring the analysis. <br />With the receipt of an acceptable stability analysis, waste and spoil stabili- <br />zation on the mine bench and haul road should be adequate. <br />I r1~ <br />'~j~,~,~ <br />The TA states that underground development waste will be hauled to the Red <br />Canyon mine's permitted waste disposal pile site. There is no discussion as <br />to the stability of the Red Canyon mine waste disposal pile. <br />