My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12282
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:39 PM
Creation date
11/19/2007 2:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Application Correspondence
Doc Name
FINAL ACTION ON MT GUNNIOSN 1 MINE PLAN ARCO COAL CO
From
USOSM
To
ACTING DIRECTOR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIillllll <br /> <br />Memorandum <br />United States Department of the Interior <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />WASHLIQGTON, D.C. 20240 <br />i <br />To: Acting Director .~~ ~~~ 4 <br />Ij(1~~i <br />From: l~i~"F~ssistant Director, Technical Services and Research <br />Subject: Final Action on the Aft. Gunnison ~1 I4ine Plan, ARCO <br />Coal Company <br />We have reviewed the proposed Mt. Gunnison #1 Nine Plan approval <br />document and find that the following information has surfaced <br />since the Regional Director's recommendation letter was received. <br />This new information should be considered in the approval of this <br />mine plan. <br /> <br /> <br /> <br />A request for an informal hearing per section 513(b) was filed <br />with OSb1, and the informal meeting was completed on May 14, 1981. <br />In accordance with section 514(a), approval or denial action <br />should have been taken by July 13, 1981. However, final agree- <br />ment on the permit stipulations with the Colorado Mined Land <br />Reclamation Division, the Bureau of Land Management, and OSM was <br />not reached until July 7, 1981, after which the Regional <br />Solicitor initiated his review. The Solicitor's recommendation <br />letter was received July 14, 1981. in the meantime, ARCO <br />requested a "Formal Hearing" on the State's permit, and a hearing <br />is scheduled for July 23, 1981. A decision could be made at this <br />meeting or the decision could be continued until their next <br />meeting. <br />At this time, the stipulations in both the Colorado permit and <br />the Federal permit closely resemble each other. Therefore, if <br />changes do occur in the Colorado permit as a result of the <br />hearing, these changes could result in .a conflict with the <br />Federal stipulations. <br />In order to expedite the approval of the mine plan and finally <br />the permit, we recommend that the mine plan be approved by the <br />Assistant Secretary, Energy and I4inerals with the stipulations <br />that the permit will be withheld until the Secretary can be <br />assured that changes, if any, resulting from the public hearing <br />are compatible with the Federal permit stipulations. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.