My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11995
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:20 PM
Creation date
11/19/2007 2:26:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Application Correspondence
Doc Date
2/18/1997
Doc Name
BOWIE NO 2 MINE NEW PERMIT APPLICATION PN C-96-083
From
J E STOVER & ASSOC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES <br />z768 coMPASS DRIVE, smTE tot <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE RECIAMA770N <br />February 13, 1997 <br />~„ ~r~ <br />David A. Beny ~F R 1 iS 139 <br />Division of Minerals & Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 ~ "~~ <br />RE: Bowie No. 2 Mme; New Permit Application; Permit C-96-083 <br />Dear Mr. Beny: <br />iii iiiiiiiiiiiuiii <br />999 <br />crva ErrcINeatPrc <br />CONSr. MANAGEMEI7f <br />Enclosed are two additional adequacy items for the referenced permit application. <br />A letter dated February 12, 1997 from the SHPO which indicates the recordation is <br />complete on the property. This letter should be inserted into Volume VI. <br />2. Enclosed is the Additional Geotechnical Investigation -Coal Mme Waste Bank -February <br />12, 1997 prepared by WESTEC. This document should be inserted into Volume VII, Tab <br />8. The introduction for Volume VII was also revised. I added a sentence to the second to <br />the last paragraph on page 3 which commits BRL to review and revise the reclamation <br />plan if necessary to address geotechnical problems encountered during site construction. <br />The discussion at the bottom of page 4 was revised and a new section was added to page <br />5 to summarize the WESTEC study. <br />The following information is enclosed <br />Item Description <br />Page vi New table of contents for Volume I and Volume VI <br />Page vu New table of contents for Volume I <br />Letter SHPO letter dated February 12'" to be inserted into Volume VI <br />Sheet New eight tab table of contents for Volume VII <br />Report Revised introduction to Volume VII (Tab 1) -five pages <br />Report WESTEC report to be inserted into Volume VII, Tab 8. <br />Sin~cerelyp,~ <br />/f~ " <br />Jim Stover, P.E. <br />Consulting Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.