Laserfiche WebLink
~riUG-13-97 04:24 PM <br />August 5, 1997 <br />GRE'i STONE <br />• <br />£nl~irnnmenrai Planners, <br />Mr. Kent Gorham <br />Colorado Division of Minerals and Geology <br />1313 Sherman, Room 215 <br />Denver, CO 80203 <br />13037219298 <br />• <br />P. 01 <br />III IIIIIIIII IIII III <br />999 <br />F09t•il' Fat Note 7671 Oale p°yaa~ <br />Te ~ From. <br />L <br />Co./Wpi. ~ W G zC <br />Phone M Phone <br />fat ~ Fea e <br />Subject: Lorencito Canyon Mine, C-96-084, Bond Calculations <br />Dear Mr. Gorham: <br />We have re-formatted the Division's bonding calculations and provide the attached tables as <br />summaries for Section 3 of the Permit Application. These summaries compile die <br />~ reclamation tasks by operation and by year to afford the greatest flexibility in incremental <br />bonding. Our tables provide cross reference to the Division's tasks and the costs Ms. Binns <br />associated with them. We have identified discrepancies in the acreages Ms. Binns used for <br />revegetation costs and have proposed modifications for tasks /f6, !/7 and ry8 as described <br />below. LCC has a different perspective on the operation efficiencies in Tasks k 87 and <br />p87A, as the Division did not account for the side-by-side method of dozing which we <br />proposed in our original bond. (She had applied this method to other tasks). Lastly, the push <br />distance for Task !!88 applied by the Division was twice the distance required. <br />Lorencito Canyon Mine <br />Bond Calculation Summary <br />Task q 6 <br />Task Description: Revegetate portal areas, R1, R2, P3, PllP2 with the oaklpinyon seed <br />mixture totaling 25.26 acres. <br />The correct acreage from Table 2.05.4-1 equals 38.0 acres for the portal areas. Also, the <br />calculation for reseeding and revegetation within Task q6 does not cake into account the two <br />different types of seed mixtures, but lumps all of the disturbed acreage [o be reseeded to one <br />~ type of seed mixture. The reclamation cost for each disturbed portal area should he <br />calculated by the cost per acre for the resulting seed mixture, either oaklpinyon or grassland, <br />and multiplied by the total acreage for each vegetation community type. For example, the <br />PI/P2 disturbance should be split be[ween the grassland and oak pinyon seed mixture. <br />Task p 7 <br />Task Description; Revegetate loadout, haul roads, and access roads with grassland seed <br />mixture totaling !98.06 acres. <br />The correct acreage from Table 2.05.4-1 equals 158.1 acres. This task should also include <br />the revegetation costs for the transmission line (2.4 acres) and rail line (3.8 acres). The total <br />reclamation cost would be calculated as explained in Task p 6. <br />5990 Greenwood Plaxa Blvd. • Suice 250 • Englewood, Coluradu 8011 I <br />Phone (3031 830.0930 Fax (303) 721.9298 <br />