My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11653
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:58 PM
Creation date
11/19/2007 2:22:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Application Correspondence
Doc Date
6/7/1989
Doc Name
RIMROCK MINE APPLICATION C-89-074 CONTINUATION OF PERMIT APPLICATION ADEQUACY REVIEW
From
MLRD
To
RIMROCK COAL CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;.;. _. III IIIIIIIIIIIIIIII ~Y <br />STATE_OF COLOIZP~DO <br />Roy Romer, Governor <br />n <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Dlreetor <br />June 7, 1989 <br />Mr. William T. Davis <br />Rimrock Coal Company <br />P.O. Box 20611 <br />Denver, Colorado 80220 <br />RE: Rimr~k Mine (Application No. C-89-074) Continuation of Permit <br />Application Adequacy Review <br />Dear Mr. Davis: <br />As indicated in the Division's first adequacy review letter dated <br />April 25, 1989, the adequacy review of the Rimrock Mine application has been <br />continued and the following additional comments have been made. <br />Rule 2.04.7(2) <br />In the ground water sampling done after the SOAP Study was completed, the <br />designation EGE is used for one of the groundwater sites, ie. The J+bntoya Dug <br />Well. The designation EGE was also used earlier fora surface water sampling <br />site during the SOAP Study. Further use of the designation as a groundwater <br />sampling site should not be made due to the confusion created. <br />More detailed cross sec tions of the Engleville Gulch Channel are needed in <br />order to accurately establish premining channel morphometry and projected <br />flood plain configurations as well as to evaluate the adequacy of the channel <br />reclamation plan and assist in locating mine facilities;-etc. at a safe <br />distance from the channel. (Also see comments section 2.05.4 and 2.05.3(3) <br />this letter) <br />Rule 2.05.3(3) <br />Only one haul road is shown on the Exhibit P Map. How will the operator haul <br />coal from the Phase 2 mining on the east side of the gulch? If additional <br />haul road is required, then it must be designed and constructed in compliance <br />with Rules 4.03.1(2) and (4 ). <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.