Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />D Moore Pascoe, [,ec ulme Direct Ur <br />eii iiiiiiiiiiiu iii <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON Direclar <br />•3 iC hd~O D Lamm <br />Govc~no~ <br />~~ <br />3 March 1982 <br />TO: Mike Savage ~//J ~ <br />FROM: Jim Pendleton `~.,.,__ <br />RE: Quarterly lnspection eport for the "East Dump" at the Bourg Mine <br />I have reviewed the quarterly inspection report submitted by Flatiron <br />Company regarding the construction of the "East Dump" overburden spoil pile <br />at the Bourg Coal Mine near [Jalden, Colorado. In the future, following <br />onset of material placement in the "East Dump", the inspection reports <br />should specifically discuss the degree of compaction being achieved, the <br />stability of resulting embankment slopes, and conformance of the construction <br />with the approved plans. Our major concern is verification that the facility <br />is being constructed as designed. <br />cc: Fred Banta <br />Dave Shelton <br /> <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 TDI (303) 866-3567 <br />