Laserfiche WebLink
0 <br />FLATIRON <br />PAVING COMPANY <br />POST OFFICE BOX 229, BOULDER, COLORADO 80306 • <br />April 30, 1981 <br />Robert Liddle <br />Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Bob: <br />I I~I-- - - <br />`` ~II II~IIIII~I~~~ ~I~ <br />sss <br />RECEIVED <br />MAY 0 4 1931 <br />~1111ED LAND RECWNATION • COAL <br />COLO, D8T OF t4ATU1NL IIESOJ0.CE5 <br />PHONE: (303) 443.9400 <br />This letter is in response to our conversation last week <br />regarding the Bourg property. Since we talked, Walt has <br />corrected the problem you mentioned in your inspection report <br />regarding H pond. <br />I would call attention to your inspection report dated <br />October 28, 1980 where we were specifically instructed to <br />strip the topsoil below the embankment of H pond. At the <br />next inspection trip by Mike Savage in January, I specifically <br />showed him the cut at H pond and was told that everything was <br />in order. <br />The Walden Coal Co. has attempted to comply with the <br />myriad of federal regulations dealing with the mining of coal. <br />However, the inconsistent view that different inspectors make <br />in their reports only complicates the process. In addition, <br />we have incurred double costs as a direct result of the Mined <br />Land Reclamation staff. I hope that future reports will re- <br />flect a more consistent policy. <br />Sincerely, _}.. <br />r.~J~ <br />Jay Stewart <br />cc:Margie Winter <br />file <br />JS:mm <br />