My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10126
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:33 PM
Creation date
11/19/2007 2:08:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Application Correspondence
Doc Date
11/19/1981
Doc Name
BEAR COAL CO
From
UTE ENGINEERING & SURVEYING
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />~~~ ENGINEERING S SURVEYING COMPANY <br />BOX 674 • 443 DODGE DELTA, COLORADO, s141a ,03-s74-7593 <br />8580 <br />November 18, 1981 ~~~~'~~® <br />Mined Land Reclamation <br />433 Centennial Building <br />1313 Sherman Street NOV 1 9 1981 <br />Denver, Colorado 80203 <br />MINED LAND RECLAMATION <br />ATTN: Dan Mathews Ce!o. Dept. cf ~~stur2l Rese_~rces <br />Re: Bear Coal Company <br />This letter is in response to the Preliminary Adequacy Review <br />Letter, dated May 15, 1981. <br />Each of the concerns identified in the May 15, 1981 letter have <br />been addressed and are enclosed for your review. All of the <br />revisions have been labelled as "REVISED May 15, 1981". The <br />revisions are enclosed as two (2) separate volumes. <br />Volume 1 consists of the responses to the Preliminary Adequacy <br />Review Letter. The letter is enclosed in the front of Volume 1 <br />and the location of the response to the concerns in the letter <br />are identified by Page, Figure, Table, Drawings or Map numbers <br />in large type. A complete list of revised Figures, Tables, <br />Drawings and Maps are included. They are inserted in the <br />appropriate places in the report. <br />Volume 2 is the Slbpe Stability Analysis for the West Portal Area. <br />An inspection on October 24, 1981, by Dan Mathews and LeRoy Black <br />of the main drainage at Bear Mine and the "permanent runoff <br />diversion" referred to in the Preliminary Adequacy Review letter, <br />revealed the drainage to be full of debris and natural litter. <br />This indicated the scarcity of runoff in the drainage and lessened <br />the importance of the diversion for the remainder of Bear Mine's <br />operation. The diversion is not permanent and will be eliminated <br />at the end of the Bear Mine's operation. This change has been <br />noted on the revised figures. <br />Contact this office if you have any questions or require additional <br />data. <br />/~~ ~C 1Z0Y Oy/ALk 6y / <br />E. LeRoy Black <br />ELB/ab <br />enclosures <br />cc: Bear Coal Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.