Laserfiche WebLink
<br />~ III IIIIIIIIIIIIIIII <br />STATE OF COLORADO gICHnRD D. LAMM, Govemm <br />DEPARTMENT OF NATURAL RESOURC ES <br />D. Monte Pascoe, Executive Director <br />MIlVED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 839-3587 <br />David C. Shelton <br />Director <br />M E M 0 <br />October 18, 1982 <br />To: Sandra Emrich <br />From: David Craig ~~~ <br />Re: Foidel Creek Mine - Completeness Review <br />I have completed the second completeness review for the proposed Foidel <br />Creek Underground Mine. My first completeness review (memo of September <br />21, 1982) identified two issues which were instrumental in deeming the <br />original application incomplete. Specifically, the two issues raised <br />were: (1) the lack of a geochemical analysis of roof, floor, and coal <br />strata (Rules 2.04.6(2)(a)(IV)(D) and 2.05.4(2)(f)); and, (2) the lack of <br />baseline hydrologic data for the Twenty-Mile sandstone aquifer (Rule <br />2.04.7(1)). Both of these issues have been at leasm minimally addressed <br />in the revised application. Therefore, I feel that the geology, ground <br />water, and mine portal sealing portions of the application are now <br />complete. <br />Note: My adequacy review of the Foidel Creek mining application will <br />probably take between one and two weeks to complete. <br />cc: Jim Pendleton <br />