My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10053
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:28 PM
Creation date
11/19/2007 2:07:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Application Correspondence
Doc Date
1/18/1982
Doc Name
ADEQUACY REVIEW BEAR 1 AND 2 MINE PRELIMINARY ADEQUACY RESPONSES AND 3 REVISION
From
MLRD
To
BEAR COAL CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ric nartl D Lamm <br />Governor <br />January 18, 1982 <br />Mr. William A. Bear <br />Bear Coal Company, Inc. <br />Somerset, CO 81939 <br />RE: Adequacy Review - Bear No. 1 and No. 2 Mine <br />Preliminary~Adequacy Responses, and N3 Revision <br />Dear Mr. Bear: <br /> <br />The Division has completed review of the adequacy responses for the <br />Bear kI and b2 received Nobember 19, 1981. There are a number of concerns, <br />primarily relating to the reclamation plan, which must be resolved <br />prior to permit issuance. <br />The permit revision submitted for the Bear K3 received November 13, 1981, <br />has been revieloed for preliminary adequacy. A separate review letter <br />for that application has also been completed. Both review letters are <br />enclosed. The deficiencies noted in the enclosed letters must be <br />resolved before the Division can make the required written findings. <br />Attached are comments from ARCO Coal Company regarding the permit revision <br />application for the Bear H3. Most of the concerns addressed in the <br />comments are also addressed in the adequacy letters enclosed. However, <br />comments 1 through 4 regarding the legal description of the revision <br />area and Bear Coal Company's legal right of entry are not addressed <br />in the Division's review letter. The legal description must be corrected <br />as quickly as possible, and a corrected notice published in the North <br />Fork Times. As you are aware, Bear Coal Company must be able to <br />demonstrate Zegal right of entry for the main haul and access road right <br />of way into the surface facilities area, the access road right of way <br />to the mine portals, and the conveyor right of way to the rail Ioadout. <br />DEPARTMENT OFNATUNALRESOURCES <br />D Monte PaSCne E+eculive OnrClor <br /> <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHEL7 UN Director <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.