Laserfiche WebLink
d <br />e <br />~~J <br />~f <br />,~,~pp6 <br />OF-~ ~_F~e`°~m ~°~ <br />O' y~ <br />~~~~~~~~~,0 <br />11-28-06 <br />~~Z Bridal Veil Constroction LLC <br />°`'~lPO Box 1821 <br />Ouray, CO 81427 <br />Q~ Division of Reclamation, Mining and Safety <br />701 Camino del Rio <br />Room 125 <br />Durango, CO 81301 <br />Attn: Bob Oswald, Phone 970-247-5193 <br />RE: Mine 1D # M-2001-054, response to inspection dated 8-11-06 <br />Dear Mr. Oswald, <br />~, , , <br />..~ <br />`:~ ;C <br />~~ <br />R <br />~F Fc~i~~.i <br />O, ~' <br />~Q(jb. <br />Min c ~'ec/ <br />8 aposa ~~~ .. <br />GeR~Z~'~~-Y-IVr: <br />/~-zy-~ G r t 5 <br />Please accept the following corrective actions in response to your inspection dated 8-11- <br />06, with the extension of 9-26-06. <br />Remaining Problems/Possible Violations and Corrective Actions: <br />We appreciate the 2 month extension on cleaning the sediment pond. It is <br />now clean and operating to full capacity. The channel is cleaned and <br />operating to a full capacity also. Wet weather has been a big hindrance this <br />summer. <br />Because of unsafe road conditions, we have not been able to get to Montrose to get the <br />photo's processed. We will send them as soon as we can get them back. I will plan to <br />have them to you within 15 days. It looks like'- --~~ather and roads are predicted to be <br />unsafe for the next few days. <br />Thank you for your understanding! <br />Sind ~/~%a:w" <br />`~ n <br />Lynn Olin <br />Bridal Veil Construction LLC <br />