Laserfiche WebLink
III IIIIIIIIIIIIIIII~ ~l~~a ~l~h~~~. <br />~~n::,,,~~ 999 ~ d~-~9~{ <br />OCT 11 ~~ <br />THIIiD QUARTER 1994 <br />Critical construction periods of the French drain and soil buttress installation (Technical <br />Revision No. 66, Siide Repair and SW Lower Refuse Pile Re-Configuration 9/93) were <br />inspected. <br />During the 3rd Quarter 1994, the following construction was completed on the Lower <br />Refuse Pile according to the approved Technical Revision: <br />1. Removal of all organic material and topsoil, <br />2. Placement of under drainage systems, <br />3. Installation of surface drainage systems. <br />The construction was completed according to the approved plans and specifications, and <br />inspected by qualified persons under the direction of a Certified Professional Engineer. <br />Phi] G. Schmidt <br />~ ~. ~~:~ <br />3~ <br />r `" <br />~" ~ <br />i` - i <br />~C ~~ ~ ~~r <br />~6S , <br />'~ , <br />~... <br />~. <br />I2~~g~ <br />Date <br />