Laserfiche WebLink
,, ~ i <br />;~. <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION <br /> <br />i ^: <br />III III III III IIII III <br />NOV No.C-$~-bit( <br />PermitNo.: C-$1-02~ Mine: Snr,err~~ ~`~~Ne <br />Type of Mine: U~~Q•hre.+w\, f.de,e.\ County: Gvrw~,re~ <br />Operator (If Other than Permittee): Permittee: (,I.S.Stae\ }1~N~waCa. <br />>:,~.;~ar Cea\Ca. Mail Address: 600 G~u,.i T~rQ.rt,~oo>~181'{ <br />Mail Address: 1(l'a. S.~Q~o^SY,Sv,'~e $00 Qit'~S~7Urv. ivr~MSU,ver,A 1530 ' <br />q Date/Time of Ins ection: <br />QO yak 267q, Coloro o Sar,.~T.<o SOgdl P ~~ <br />v <br />Inspector: ~harv~os Sc1,re'~rar ^ <br />Person Served: <br />ignature o person served <br />s .~~~ <br />a0 f- / <br />~~igna~ authorise repc7 resen'tative <br />of Mined Land Reclamation Division) <br />ease prin name an i e Date a/nd Time of Service: <br />CERTIFIED MAIL N0. P 168477463-Kaiser ~f~-..F a f~ ~ 9 ~7 3; 3 v ~PM. <br />Return Receipt Reques a 477462-U.S. Steel ," <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not X expressly, or in <br />practical effect, required by this notice. For this purpose, mining" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />b5, 000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />,. <br />i <br />_,.,d <br />