Laserfiche WebLink
U. S. DEPT. OF THE INTERIO <br />C~~I~~FICE OF SURFACE MINING <br />'R 18 2007 Mine Site Evaluation <br />State Program ~`'°F`°~~ <br />1. Permittee/P~8fP9 a~'d Safety 9. Permit Number 10. Permit Type <br />PICKETWIRE PROCESSING, LLC. C-012-81 PP <br />2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br />34115 CO. RD. 20.8 04/03/2007 <br />3. City 4. State mm-dd -yyyy <br />14. Permit Status 15. Site Status 16. Facility Type <br />Trinidad CO <br />A^ AN BEF <br />5. Zip Code 6. Phone Number <br />17. OSM Office # 18. CCID # 19. Land Code <br />81082 (719) 846-2427 <br />7. Operator Name, if Different than Permittee 140 <br />20. M.S.H.A ID # 21. State Abrev. 22. County Name <br />8. Mine Name OS-00296 CO LAS <br />23. AVS Permittee Entity ID Number 24. State Office <br />NEW ELK <br />103972 <br />25. Hours 26. Si tore Block 27. Reviewing Official: <br />1.0 a. Permit Review U <br />0 ~-~~ J ~~ <br />Sign e: ~ 1 Signature: <br />4.0 b. Site Visit Time <br />HENRY AUSTW ID # 116 <br />g,0 c. Travel Time Review Date: ~ /lg /(, 7 <br />Printed Name: mm - dd - yyyy <br />2,0 d. Report Writing Date: 04/10/2007 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />per..„Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 73 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 74 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. A61.. Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) A62..Partially Reclaimed Forfeiture: Forteited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forteited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...NO Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting pphase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The R4 has g9ranted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ Sion of forteited site is in progress. <br />have not begun. 817.131(b). FR.. Forteited and Reclaimed: Forfeiture <br />AP.. Alive Coal Producing: Coal surface mining P1...Phase I RRelease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal p3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />-Fac111ryType Codes = Item-16-D.-.Ancillary (fiaulroad; Conveyor, and/o>r Rails-H-ExploraZion~ermits L.-. Remining site ppermittetl- <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR765.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a encv's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of Z <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). ae.iem ne~amn~. a, ,99s <br />