Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />,~1~®FFICE OF SURFACE MINING <br />t5 2003 Mine Site Evaluation <br />___1ne~ State Program <br />1.Permittee/Perg oSM~fineixlsa 9. Permit Number 10. Permit Type <br /> BASIN RESOURCES, INC. C-013-81 PP <br /> 2. Address 11 . Field Visit Date 12. Purpose ] 3. SRA Present <br /> 3800 COUNTY ROAD 63.9 09/10/2003 O~ <br />3. City 4. State mm-da -yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br />Trinidad CO <br />BR P2 <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81082 (719) 846-2427 <br />140 ~ SF <br />7. Operator Name; if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> LAS <br /> OS-02820 CO <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />GOLDEN EAGLE <br /> 103972 <br />25. Hours 26. S' nature Block 27. Reviewing fficial: <br />q.p a. Permit Review 3 ( <br /> <br />0 b. Site Visit Time <br />3 'i nature: Signature: <br />. HENR AUSTIN ID # 116 <br />~ <br />Travel Time <br />c Review Date: <br />( /Ig/ ~ 3 <br />. <br />10.0 Printed Name: mm - dd - yyyy <br />2,0 d. Report Writing Date: 09/16/2003 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 - CCR....Citizen Complaint Referral (non site visit) <br />Oxx Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermitted but not yet disturbed. AB1.. Bond Forfeiture: good forfeiture off cially in process or completed, and. <br />active (Per <br />ram Permit): Phase II com <br />leted or <br />I <br />anent Pro <br />IN <br />l <br />ti <br />t <br />i <br />t <br />d <br />p <br />n <br />m <br />g <br />.... <br />rec <br />ama <br />n progress or no <br />ye <br />on <br />commence <br />. <br />Temporary Cessation of Operations. (Interim Program Permit) A62..Partially Reclaimed Forfeiture: Forteited site where all bonds have been <br />Coal mining compieted~and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...NOt Applicable: When site is unpermitted. <br />Site Status Codes-Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting pphase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The R4 has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ lion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />P1 <br />Ph <br />l <br />At l <br />t Ph <br />I b <br />d <br />l <br />l <br />ti <br />d <br />l <br />l <br />rf <br />I RR <br />eas <br />ease rec <br />ace mining <br />... <br />ase <br />e <br />ease: <br />ase <br />on <br />re <br />ama <br />on complete <br />. <br />AP.. Active Coa <br />Producing: Coa <br />su <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Sife: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release, is permitted but there is no bond. <br />facility such as fipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />for th <br />itted ar <br />i <br />it St <br />t <br />i <br />it <br />i <br />ti <br />ti <br />h <br />t <br />ki <br />M <br />Th <br />P <br />ti <br />l <br />d <br />ng: <br />a <br />us <br />s ac <br />ve, s <br />e <br />s <br />e en <br />re perm <br />ea. opera <br />ons <br />ave or are <br />a <br />ace an <br />in <br />e <br />erm <br />ng p <br />NM..No <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all bond. required ermits from the Ft4. <br />Facility Type Cotles -Item 16 D...Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Ezempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boazds were established to receive comments &o <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenc 's <br />responsiveness to small business. If you aze a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />_ <br />and wish to comment on the enforcement or compliance activities oFOSM, cal] 1-888-REG-FAIR Q-888-734-3247). ne„:ra nkunxr a, is9s <br />