Laserfiche WebLink
R~c~B~E® <br />`'- ' ~ Bridal Veil Construction, LLC SUN p3 2~3 <br />PO Box 1821 Divisionnr <br />Ouiay, CO 81427 Minerata end CenluBY <br />May 27, 2003 Rece;~~d <br />Mr. Bob Oswald M~~ ~i' <br />~C., Environmental Protection Specialist ~ 2~d3 ~ <br />_~ State of Colorado ~trrd <br />~~ old field <br />Division ofMinerals and Geology Mf Ory• <br />701 Camino Del Rio, Room 125 ner~3 Gp% <br />Durango, CO 81301 <br />i i <br />RE: Bridal Veil Construction, M-2001-054, Inspection of 5-7-03, letter of 5-14-03 <br />Dear Mr. Oswald, P~aa ~ 0 ~ !.a w~'t-i V e ^~-df'~a ws , ~ <br />As of May 25, 2003, we have finished the necessary stabilization earthwork to the road <br />cut along the northern boundary of the property. We reseeded the cut and covered it with <br />hay and straw to keep the seeds in place and moist on 5-25-03. There are pictures <br />enclosed, showing you what we have done and the finished result. We have also brought <br />the mine engineers to the job site to certify that the results were the best that we could <br />accomplish. This completes item 1 on your letter dated 5-14-03. <br />For item number 2, we have asked the loggers to finish their work so that we could re- <br />construct the runoff channel, where we altered it so they would have access to the trees. <br />They will be out within approximately one week, and we will finish the channel <br />construction and send pictures and certification to your office by July 31, 2003. <br />Item 3: We have continued the work on the sediment pond, and will have this completed <br />as per engineers newly calculated dimensions and depths well before the July 31 <br />deadline, with proof and certification of the structure to your office by July 31, 2003. <br />Item 4: We have ceased all work on bench number 2 and will finish the excavation, <br />shaping and grading of bench 1 and establish its upper slope after the channel and <br />catchment basin are complete. We will only use bench 2 as a storage and staging area for <br />dirt and materials taken from the channel, the catchment basin, and bench 1. The only <br />thing we will do and have begun is knocking down the high walls on the east bank to <br />make a safe slope. <br />Item 5: We will seed all buffer areas being remedied according to all aspects of the <br />revegetation plan in the approved reclamation plan and send proof and dates of seeding <br />by November 15, 2003. <br />Thank you for your help. We look forwazd to working with you and if there aze any <br />additional concerns, please let us know, as we want to do this right! You can reach me on <br />