Laserfiche WebLink
LI <br />arP N.ENr OF rh~ym U. S. DEPT. OF THL INTERIOR r't=CEIV <br />- n° OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT ~ <br />Mine-Site Evacuation Inspection Repor~~~ 21 1 <br />.~ <br />~ACN a ~° <br /> <br />1- Permittee/Person <br />9. Permit Number ,.~ .., .,.,,v,d6d0 y <br />y aPennit9b.RA <br /> PITTSBURGH & MIDWAY COAL CO. C-80-001 PP ~S <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> <br /> P.O. BOX 176 09/19/1996 SPl Ya YM <br /> YY-DD - rr <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> OAK CREEK CO ~ MC <br />5. Zip Code 6. Phone Number l7. OSM Office # l8. RSI # 19. Land Code <br />80467 -~ 303-736-8111 140 <br />7. Operator if Different than Perm ittee 20. M.S.H.A. ID # 21. State Code 22. County Code <br /> <br /> OS-00303 08 107 <br /> <br /> 8. Mine Name 23. AVS Permittee Entity ID Number 23b. State Office <br /> <br /> EDNA STRIP 104016 <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com liance 2=Noncom liance 3=Not Planned 4=Not S 6=Noncom Hance Identified Elsewhere <br />A. Administrative D. Backfdling & Grading H. _Subsldence Control Plaa <br />l._Mining within Valid Permit l.~Exposed Openings L Roads <br />2._Mining within Bonded Area 2. 1 Contemporaneous Reclamation I.~Road Conswction <br />3._Terms & Conditions of Permit 3. 1 Approximate Original Contour 2.~Certification <br />4._LiabiGty Insurance 4.~Highwall Elirtrination 3.~Drainage <br />5._Ownership and Control 5. 3 Sleep Slopes (includes downslope) 4.~Surfacing and Maintenance <br />6 _Temporary Cessation 6.~Handlrng of Acid & Toxic Materials S.~Reclamation <br />B. Hydrologic Balance 7. 1 Stabilization (rills and gullies) <br />1.~Drainage Conwl E. Excess Spoil Disposal J. Signs & Markers <br />2.~Inspections & Certifications l._Placement I.~Signs <br />3.~Siltation Swctures 2._Drainage Control 2.~Markers <br />4.~Discharge Swctures 3._Surface Stabilization K, Distance Prohibitions <br />S.~Diversions 4._Inspec[ions & Certifications <br />6.~Effluent Limits L. Revegetation <br />7. 1 Ground Water Monitoring F. Coal Mine Wade 1._Vegetative Cover <br />B.~Surface Water Monitoring (Refuse Piles/Impoundmenfs) 2._Timrng <br />9. 3 Drainage -- Acid-Toxic Materials 1._Drainage Control <br />IO.~Impoundments 2._Surface Stabilization M. ~Postmining Lend Use <br />11.1 Stream Buffer Zones 3._Placement <br /> 4._inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5._Impounding Swctures <br />1._Removal <br />Substitute Materials <br />2. <br />G. Use of Explosives _ I ) <br />_ <br />3._Storage and Protection l._Blaster Certification <br />2 <br />Distance Prohibitions <br />-2) <br />4._Redistribution . <br />3._Blast Survey/Schedule 3 <br />) <br /> 4._Wamings & Records - <br /> 5._Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a. Date d last <br />~~~ / / <br />16.0 a. Permit Review a Total <br />1532.0 hooded <br /> <br />4334.0 a <br />Pertnitted <br />Frcgneoey for previous 4 Calendar Qtrs. <br />b. Numberd Numberd <br /> <br />11 <br />0 b <br /> <br />0 <br />0 Phase [ <br /> <br />released . <br />rer•dted complete <br />eorngete ^p mspec6ora ^p . <br />b. Inspection Time . 1000.0 b. Disturbed <br />~~ orduaed 8.0 c <br />Travel Time 0.0 c teleased6 (Estimated) <br />aNunberd Numherd . <br /> <br />al , <br />0 ~ ~ <br /> <br />2.0 d <br />R <br />rt Writin d Phase III <br /> <br />0.0 <br /> <br />Page 1 of V <br />- <br /> . <br />g <br />epo roleased roor <br />......r > <br />