Laserfiche WebLink
., • - -- - - ~ 1 of 4 <br />Colorado Di III III III III IIII III -ology <br />RECLA 999 <br />_____________________________ <br />PERMIT NUMBER M-90-059 PREP. BY: WHE FILENAME: M059-0 <br />_____-__ _-____-_ _____-____-- ~ ~ J ~ <br />DATE 21-Ju1-99 OPERATION: Eldorado Pilot ® ~~! J~~ ®r FIC ~ <br />PERMIT ACT lON General 110(1) bond review ~~ p~~`~ ~'I"~ "~~~ <br />- - --------------------------- la i Li /-? - ~T o - a s9 <br />GRAND TOTAL 80ND AMOUNT E2,344 YC / n <br />I. DIRECT COSTS =___________ SI 1 C. EIgJ/[!(lO ('~o~ <br />_ _________________________________________ <br />A. EARTHWORK - BACKFILLING 8 ROUGH GRADING <br />Task No.l Tesk Description I Cost (E) <br />--____-- I __________________________________________________ I ___-_-____-- <br />I I <br />2 I Approx. 16 hours of backhoe time to complete I E759 <br />I backfilling of portal cut, removing waste rock I <br />I from direct contact with stream flow, and grading) <br />waste rock to approx 3H: 1V slopes to blend I <br />with native slope. I <br />116 hrs ' E47.44/hr = E759.04 ~ ECE~1/~r~ <br />I I - <br />I Backfill portal cut = 319 cy I ~lil) <br />I Portal cut = 49'L ' 22'4 * 8'H = 319 cy I `'~• 3 C ~n ~~ <br />I I Division of Mineral. V <br />I Waste rock slope reduction to 3H: 1V = 275 cy I ~ V ` <br />I See attached drawing, "Slope Reduction" I ~'~ <br />Subtotal (A ): E759 <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task No.l Task Description <br />Cost (E) <br />NA I Not indicated in reclamation plan <br />C. EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task No.~ Task Description <br />NA I Not indicated <br />Subtotal (B): <br />I Lost (E) <br />I ___----___-_ <br />I <br />I <br />Subtotal (C ): <br />