Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR ~~ ~ ~ ~~ ~ ~~ ~ ~~ ~~~~ ~~~ <br />999 <br />OFFICE OF SURFACE MI NENGLp a ~~~ <br />Mine Site Evaluation ~~ ~~ <br />State Program JUN 0 ~ ~nm °FSUgS~E <br />1. Permit[ee/Person 9. Permit Number l0. Permit Type <br /> KERR COAL CO. C-006-80 Islon o Inerals 8 Geo nv pp <br />2. Address 11. Field Visit Date 12. Purpose ~ 13. SRA Present <br /> 2155 RESORT DR., P.O. BOX 'j 39--5'~ 05/22/2001 OBR ~Y <br />3. Clly 4. Slate mm - dd -yyyy <br /> 14. Permit Status I5. Site Status l6. Facility Type <br /> STEAMBOAT SPR. CO <br />Pl <br />AF <br />5. Zip Code 6. Phone Number <br />17. OSM Office # <br />18. CCID # <br />19. Land Code <br /> 80477- (970) 879-6260 <br />020 <br />SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> 05 <br />02674 JACKSON <br /> - CO <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />MARK STRIP <br />056814 <br />25. Hours 26. Sign tore Block ~ 27. Reviewing Official: <br />4.0 a. Permit Review J r'tn~l~ <br />Sig .ore: S L~ o I Signature: <br />5.0 b. Site V isit Time FIENRY A STIN ID # 116 <br />6.0 c. Travel Time Review Date: QS /may/ O ~ <br />Printed Name: mm - dd -yyyy <br />2,p d. Report Writing Date: 05!24!2001 is Supplemental MSE Page Used Y/N Y^ <br />Pennlt Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />°~„. Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial silo visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF....Citizen Complaint Follow-up <br />Joint Inspecllon -Item 13 A Joint inspection is when a state inspector accompanies en OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surtace end underground coal miningg activities have ceased end <br />operator has left the site without completing reclamat~an as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppeermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forteiture officially in process or completed, and. <br />IN....Inedive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) A62..Partially Reclaimed Forfeiture: Forteited site where all bonds have been <br />Coal mining completed end reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed end State Regulatory AB3..Reclaimed Forfeiture: Forteited site that has been reclaimed to Program standards. <br />Authortry (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpernitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permtt, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ lion of lorfeited site is in progress. <br />have not begun. 817.131(1b). FR.. Forteitetl and Reclaimed: Forfeiture <br />AP.. Active Coel Producing: Coal sudace mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />ectivRies are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bontl. <br />facilittyy such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Wining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no sudace coal p3.. Phase III Release: Reclamation completed and the activity is not covemd by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the yA. <br />Faclllty Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Untlerground F... Loading Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K...Govemmenl Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Faimcss Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. I(you are a small business (a business with 500 or (ewer employees including those of affiliates) page 1 of <br />and wish to commcnt on the enforcement or compliance activities o(OSM, call 1-888-REG-FAIR (I-888-734-3247). a~.;.w aR~ra, ivoi <br />