My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC22682
DRMS
>
Back File Migration
>
Inspection
>
INSPEC22682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:22:46 PM
Creation date
11/18/2007 9:45:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
Inspection
Doc Date
3/29/2000
Doc Name
OSM MINE SITE EVALUATION
Inspection Date
2/8/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III DEPT. OF THE INTE _ <br />Ur'r'ICE OF SURFACE M° <br />Mine Site Evaluation MAR 2 9 2000 <br />State Program p;visionofMinerab&Geolo <br />1. Perntittee/Person 9. Permit Number 10. Pernut Type <br /> NEW PRYOR C-81-U31 PP <br /> 2. Address l 1. Field Visit Date 12. <br />13. SRA Present <br />Pu~ ose <br /> BOND FORFEITURE SITE ~ . <br />02/U8/2000 I ~ <br />~ ~Y <br />3. Cip~ 4. State "a" - dd - »~ <br />^ 14. Penni[ Status l5. Site Status l6. F~acility~T e <br /> AB FR L'_~ <br />5. 7i Code 6. Phone Number <br /> <br />( 17. OSM Office # 18. CCID # 19. Land Code <br /> 14U <br />7. O erator Name, if Different Utan <br />Perntittee <br /> 2U. M.S.H.A ID # 21. Stat e Abrev. 22. County Name <br /> REVOKED - DMG ADMINISTERED <br /> HUERFANO <br />8 <br />Mi <br />N CO <br /> . <br />ne <br />ame <br /> 23. AVS Entity ID Number 24.. Slat <br />NEW PRYOR ~ <br />25. Hours i <br />26. Sign t oc 27. R <br />ev~ewing Official: <br />(L5 a. Permit Review / gq <br />~l ~~ <br /> Signa re' Signature: <br />I <br />p b. Site Visit Time <br />, MITCH RO L GS ID # 370 <br />~ <br />' <br />2 <br />p c <br />Travel Time (j t <br />I <br />Review Date: 3 / t <br />, <br />. Printed Name: mm - dd - yyyy <br />l,p d. Report Writing Date: 03/09/2000 Is Supplemental MSE Page Used Y/N Y^ <br />PermN Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visd) <br />per,,,, Oversight RFx ... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Fetlerol Actions CCF.... Citizen Complaint F"Ilow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any lime during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surtace and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(9) <br />ppermitted but not yet disturbed. AB7.. Bond Forfeiture: Bond (oAeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forteiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bontl Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forteiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />N D...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pendingg The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke fhe permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted pertormance bond(s), and/or reclama- <br />have <br />30 CFR 8161 li <br />of foAeit <br />ro <br />ress <br />t <br />t <br />d <br />d <br />h <br />ti <br />tio <br />f <br />i <br />uant t <br />d <br />it <br />i <br />in <br />l <br />i <br />g <br />s <br />ar <br />e <br />an <br />w <br />ere coa <br />ning opera <br />ons cessa <br />n o <br />m <br />ning purs <br />o <br />on <br />e <br />s <br />e <br />s <br />p <br />. <br />m <br />have not begun. 817.131(b). FR.. Forteited antl Reclaimed: Forfeiture <br />AP <br />A <br />ti <br />d <br />i <br />i <br />i <br />P1 <br />Ph <br />I R <br />l <br />At l <br />t Ph <br />I b <br />d <br />l <br />l <br />ti <br />l <br />t <br />d <br />C <br />l P <br />C <br />rt <br />.. <br />c <br />ro <br />uc <br />ng: <br />n <br />ng <br />... <br />ase <br />ease: <br />eas <br />on <br />re <br />ease rec <br />ama <br />on comp <br />e <br />e <br />. <br />ve <br />oa <br />oal su <br />ace m <br />e <br />ase <br />activities are occurring. granted for entire permitted area. Far interim FO.. Abandoned Sire: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release, is permitted but there is no bond. <br />facility such as tipple or reporation plant. P2.. Phase II Release: At least Phase II bond release WC.Wiltlcat: Coal mining and reclamation <br />la <br />d <br />No M <br />i <br />Th <br />P <br />it St <br />ti <br />it <br />f <br />th <br />itt <br />d <br />ti <br />h <br />t <br />k <br />NM <br />t <br />i <br />i <br />ti <br />n <br />ng: <br />e <br />erm <br />s ac <br />ve, s <br />e <br />or <br />e en <br />re perm <br />e <br />area. opera <br />ons <br />ave or are <br />a <br />ing p <br />ce an <br />.. <br />a <br />us <br />s <br />not in Temporary Cessation, no surtace coal p3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all band. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR766.26 <br />B... Underground F... Loadingg Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockples K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory ENbrcement Ombudsman and 10 Regiorurl Fatmess Boards were es4+blished to receive conunents Gom <br />small busNesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a ene's <br />responsiveness to small business. If you are a small business (a business u~[h 5(10 or !ewer employees including those of affiliates) page 1 Of <br />and wish to comment on the entorcement or compliance activities of OSM, call 1-RSS-REG-FAIR (1-888-734-3247) a~w<e o«~w a, i9ve <br />
The URL can be used to link to this page
Your browser does not support the video tag.