Laserfiche WebLink
~' ~~ <br />AUK <br />222 <br />Bridal Veil Pit <br />Emery Lynn Olin <br />PO Box 1821 <br />Ouray, CO 81427 <br />970-729-1823 <br />8/15/07 <br />Division of Reclamation, Mining and Safety <br />'~ 701 Camino del Rio <br />Room 125 <br />Durango, CO 81301 <br />Attn: Bob Oswald <br />Phone 970-247-5193 <br />FAX 970-247-5104 / <br />RE: Mine ID # M-2001-054 <br />RE inspection dated 5/7/07, received 6/7/07. <br />Dear Mr. Oswald, <br />VCIN 1 w"' PV-Y~ <br />~ n..,~,; ~4~ <br />J.,.,a;,~~~m Lo <br /> <br />AUG 2 72007 <br />~w~sian of Reclamation, <br />Mininy and Safety <br /> <br />Thank you for the extension in finishing the cleaning of the channel and sediment pond. <br />I want to inform you that the channel at the Bridal Veil Pit is finished and reclaimed to its <br />proper size. The two culverts have been installed in the driveway, and the sediment pond <br />has been cleaned. <br />We have had an abundance of rain in the past six weeks, but it has been dry enough in the <br />past 2 weeks to properly clean up. <br />I have taken photo's for you, which were taken on 8/13 and 8/15 and were developed on <br />8/15/07. Therefore the letter will be FAXed on 8/15/07, and mailed with the photo's and <br />postmarked on 8/16/07. <br />In a separate mailing, I am requesting a final inspection for total reclamation of the pit. I <br />will include a copy of the reclamation plan for your convenience. <br />Again, thank you for your help, <br />Lynn Olin <br />Bridal Veil Construction LLC <br />