Laserfiche WebLink
%~ <br />TELEPHONE • ' ' <br />303/534-1231 <br />„~ <br /> <br /> J <br /> FOUNDED iopr <br />4800 BRIGHTON BOULEVARD <br />September 28, 1992 <br />MINED LAND RECLAMATION DIVISION <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203-2273 <br />Attn: Carl Mount/Lorraine Stepenske <br />RE: Pit 29 <br />I.D. M-80-183 <br />D~r~ 5199? <br />DIV1S~ <br />MINERALS gU~ f~L <br />.,, <br />We are in the process of addressing the concerns listed in the inspection <br />report dated August 20, 1992. <br />ITEM I - Topsoil <br />We will probably file a revision to address where the stockpile is <br />presently located rather than move the material. We plan to <br />protect and save all the topsoil. <br />We will evaluate our options and contact you when we figure out the <br />plan to handle the topsoil. <br />ITEM II - Access Road over Topsoil <br />This action will result in the plan for the topsoil. We will <br />update when the plan for the topsoil is finalized. <br />ITEM III - Slopes on the South and West Sides <br />We plan to address the seeding this fall based on the availability <br />of the company doing the seeding as well as the slopes. We plan to <br />have the work completed in October, 1992. <br />ITEM IV - Asphalt Stockpile <br />We plan to haul out any temporary stockpiled asphalt. <br />We also will file a revision to the permit and fill areas with <br />cured asphalt. <br />S4OU9Et GRAVEL <br />~8(IANNRNI ASPHALT <br />©ID1T 1_ <br />III IIIIIIIIIIIIIIII <br />999 <br />DENVER. COLORADO 80216 /~ //~~,, <br />NAPA <br />J <br />NATIONAL ASPNALT <br />PAVEMENT <br />ASSOOICTIOM <br />