My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC17167
DRMS
>
Back File Migration
>
Inspection
>
INSPEC17167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:18:57 PM
Creation date
11/18/2007 9:19:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986104
IBM Index Class Name
Inspection
Doc Date
3/27/2003
Doc Name
Response to Inspection / Corrective Action
From
B & B Excavating Inc.
To
DMG
Inspection Date
3/5/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B&B ~~ <br />~~~'-r <br />FYCAVA77NG <br />9p ~pJ4~ <br />March 24, 2003 <br />Russell Means <br />Division of Minerals & Geology v <br />101 South 3`d Street Room 301 <br />Grand Junction, CO 81501 <br />RECE~@~!~i%-- <br />P.O. Box 1729 <br />Edwards, CO 81632 <br />(970) 926-3311 <br />FAX: (970)926-2344 <br />MAR 3 12003 <br />Division of Minerals ase ~ zcla@g <br /> <br />?7?(~? <br />°jol r ~`~a Qtt~ <br />+~e <br />~ Geology <br />Re: Response to Inspection /Corrective Acti~~ <br />Montgomery Pit, Permit M-1986-104 <br />Dear Russell, <br />We have taken corrective action on one of the two items you identified in your observation report <br />we received on Mazch 11, 2003. Enclosed you will find the Increase Rider which increases our <br />Reclamation Bond to $ 83,830.00. <br />With respect to Item 1, we ask that you grant us a six-month extension to revise, coordinate, and <br />schedule the work that is necessary to modify our Mining and Reclamation Plan to reflect current <br />conditions. I have scheduled a meeting with our mining consultant, Greg Lewicki, to begin this <br />process. The extension will move our Correction Date to November 12, 2003. <br />Item 1. "Approved Mining and Reclamation Plans were not followed" <br />Corrective Action: Technical Revision necessary -Six-month extension requested <br />Item 2. "Financial Warranty was based on phased operation" <br />Corrective Action: See enclosed Increase Rider that increases the bond to $ 83,830.00 to <br />cover the costs to reclaim the entire site as opposed to one stage. <br />Thank you in advance for accommodating our extension request. If you have any questions or <br />need further documentation, please contact me at (970) 926-3311 ext 229. <br />Sincerely, <br />n ~y' <br />Jason Burkey <br />Director of Development, Planning and Administration <br />cc: Greg Lewicki <br />
The URL can be used to link to this page
Your browser does not support the video tag.