My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14526
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:59 PM
Creation date
11/18/2007 9:06:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Inspection
Doc Date
4/20/1992
Doc Name
INSPECTION REPORTS FOR VALCO INC VADER PIT M-78-287 ROZMAN PIT M-81-014 GUNNISON READY MIX PIT M-77-
From
VALCO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />April 17, 1992 <br />~~ <br />Mr. James Stevens <br />State of Colorado <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203-2273 <br />VALCO, INC. <br />GUNNISON CONCRETE DIVISION <br />P.O. BOX 837 <br />GUNNISON, COLORADO 81230 <br />(303) 641-0951 <br />RECE~~E~ <br />APR2p199? <br />Recl minim la-~d <br />c7t10fl ~iviSlQr <br />RE: Inspection reports for Valco, Inc.: Vader Pit #M-78-287 <br />Roanan Pit #M-81-014 <br />Gunnison Ready Mix Pit #M-77-023 <br />Enclosed, Jim: <br />...are photos of the new mine ID signs that have been installed at the entrance <br />of each of the above named mines. This should satisify the #1. corrective <br />actions recommendation on all three inspection reports. <br />One of the photos shows how we have marked the mine boundary for the Vader <br />Pit. (Painted orange stones around a survey marker in the ground.) We hope <br />this will meet the corrective action reco~rmendation #2. on the Vader Pit <br />inspection report. We intend mark the boundaries at the G~uinison Pit <br />and the Rozrrian Pit but we must wait for the snow to get off the ground or <br />the field to dry up some before we can get to the places that need to be <br />marked. <br />Regarding items #3. and #9. on the Vader Pit inspection, (#3 revision of <br />phases, #4 possible temporary cessation notice.) we are working on these <br />items mar but need a little more time. We would ask that the time deadline <br />to answer these items be extended until May 11, 1992. That is the same date <br />that we must reply to items on the Rozman and Gunnison Ready Mix reports. <br />We have hired Mr. Bruce Cramb, of Pueblo, CO. to work with us on the revisions <br />and amendments to the above mentioned mines. He has authority to talk to you <br />on our behalf about all of these subjects and to submit documents, etc., but <br />I will remain the official representative of Valco, Inc. for these mines. <br />'Thank you for your consideration. <br />Sincerely, <br />~~~~ ~~ <br />George Gregg <br />General Manager <br />iii iiiiii~iiiiiiiii <br />cc: Bruce Cramb <br />ROCKY FORD PUEBLO CANON CITY LAMAR CRESTED BUTTE <br />
The URL can be used to link to this page
Your browser does not support the video tag.