My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC14049
DRMS
>
Back File Migration
>
Inspection
>
INSPEC14049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:15:32 PM
Creation date
11/18/2007 9:03:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Inspection
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
6/1/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w`Tti~ ,~ U. S. DEPT. OF THE INTERIOR <br />"'~ . ~ =~~oo~ OFF M n S rte Eva not on MININGC <br />3. 1010 <br />`" ~J~1 ~~G State Program ~ <br />1. Permittee/Person ox~ 9, Permit Number 10. Permit Type <br /> ENERGY FUE COAL, INC. C-014-81 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 115 EAST MAIN 06/01/2006 <br />3. City 4, State mm - dd - yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br />FLORENCE CO <br />IN PI BE <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81226- (7I9)784-6395 <br />140 S <br />7. Operator Name, if Different than Pemlittee <br />2 <br /> . County Name <br />20. M.S.H.A ID # 21. State Abrev. 2 <br /> 03455 CO FREMONT <br />OS <br /> - <br />8. Mine Name <br /> 23. AVS Pernnttee Entity ID Number 24. State Office <br />SOUTHFIELD MINE <br />104631 <br />25. Hours pffire Block <br />26. Sign <br />I <br />~ 27. Reviewing O <br />ffic <br />i <br />: <br />yal <br />1.0 a. Permit Review 1 <br />~ <br />~-{ <br />~f ~~ /Yy~-~. -)~U.~7T~ye~ ~y <br />/J <br />// <br />- <br />/)p/vK,ul ('G..[/l~^- <br /> ...------fff Si~ !a~)3~o6 <br />0 b. Site Visit Time <br />4 Signature: <br />. HENRY AUSTIN ID # 116 <br />' <br />6.0 c. Travel Time <br />Printed Name: ~(~ <br />Review Date: IP l ~~ l 7?ti <br /> mm - dd - yyyy <br />1.5 d. Report Writing Date: 06/13/2006 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit] <br />pxx...,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxz..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermined but not yet disturbed. ABt..Bond Forfeiture: Bond forteiture officially in process or completed, and. <br />I N....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interiim Program Permit) gB2..Partrally Reclaimed Forfeiture: Forferted site where alt bonds have been <br />Coal mining completed antl reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...BOnd Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...NOt Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND..No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />h <br />t <br />rt <br />d <br />h <br />l <br />ti <br />ti <br />i <br />i <br />t t <br />30 <br />FR 81 <br />li <br />d <br />f <br />f f <br />rf <br />ave s <br />a <br />e <br />an <br />w <br />ere coa <br />mining opera <br />ons cessa <br />on o <br />m <br />n <br />ng pursuan <br />on o <br />o <br />C <br />6/ <br />o <br />eited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: forteiture <br />rf <br />i <br />i <br />C <br />RR <br />I <br />AP.. Ac[ive Coal Producing: <br />oat su <br />ace m <br />n <br />ng P1...Phase I <br />elease: At least Phase <br />bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permittetl but there is no bond. <br />facility such as tipple or preporation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM.. No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes- Item 16 D...Ancil(ary (Haulroad, Conveyor, and/or Rails} H...Exploration Permits L... Remining site ppermittetl <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and ] 0 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including [hose of affiliates) page 1 of <br />and wish to comment on [he enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). rma:w o«~mn~r a, isss <br /> <br />'~r <br />
The URL can be used to link to this page
Your browser does not support the video tag.