Laserfiche WebLink
-aPP`~~N~~~'r_"f U. S.~EPT. OF THE INTE~IOR III ~~~~~~~~~~~~~~~~ NF,,,p <br />p m „ ~~ j O <br />$ OFFICE OF SURFACE NIIIVING RECLAMATION AND ENFORCEMENT o ~ <br />M<~ ~;_,e,9 ~ Mine-Site Evaluation Inspection Report CFOrSURFACE~2 <br /> 10. Typc <br />1. Petmittcc/Pcrson 9. Permit Number a. Permit b. RA <br />OXBOW MINING,INC. C-022-81 PP ~F <br />2. Address 1 I. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> <br />GO AIR.TOi\1 ANDERSON P.E., P.O. BOX 535 07/15/1998 FC ~Y Y/N <br /> MM UD - 1'Y <br />3. City 4. Stale 14. Permit Status I5. Site Status 16. Facility Type <br />SOMERSET CO A^ AP BCDEF <br />5. Zip Code 6. Phone Number ] 7. OSM Office # 18. RSI # 19. Land Code <br />81434 -~ 970-929-5122 140 <br />7. Operator if Different than Pet-mi ttee 20. M.S.H.A. m # 21. State Code 22. County Code <br /> <br /> OS-00294 08 051 <br />8. Mine Name 23. AVS Permittee Entity [D Number 236. State Office <br /> <br />SANBORN CREEK MINE <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom licence 3=Not Planned 9=Not Started S=Noncom licence Identified Elsewhere <br />A. Administrative D. Backfdling & Grading H. 1 Subsidence Control Plan <br />1. 1 Mining within Valid Permit ].Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1.~Road Conswction <br />3. 1 Terms & Conditions of Perm it 3. 1 Approximate Original Contour 2.~Certification <br />4. 1 Liability Insurance 4. 1 Highwall Elimination 3. 1 Drainage <br />5. 1 Ownership and Control 5. I Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6._Temporary Cessation 6._Handling of Acid & Toxic Materials 5. 1 Reclamation <br />7. 1 AML Rec. Fees -- Non-Respondent 7. 1 Stabilization (rills and gullies) <br />8. 1 AML Rec. Fees -- Failure to Pay <br />E. Excess Spoil Disposal <br />J. Signs & Markers <br />B. Hydrologic Balance 1. 3 Placement 1. 1 Signs <br />I. 1 Drainage Convol 2. 3 Drainage Control 2. 1 Markers <br />2. 1 Inspections & Certifications 3. 3 Surface Stabilization K. 1 Distance Prohibitions <br />3. 1 Siltation Swctures 4. 3 inspections & Certifications <br />4. 1 Dischazge Suuctures L. Revegetation <br />5. 1 Diversions F. Coal Mine Waste 1. 1 Vegetative Cover <br />6. 1 Effluent Limits (Refuse Piles/Impoundments) 2. 1 Timing <br />7. 1 Ground Water Monitoring 1. 1 Drainage Convol <br />8. 1 Surface Water Monitoring 2. 1 Surface Stabilization M. 1 Fostmining Land Use <br />9. 1 Drainage -- Acid-Toxic Materials 3. 1 Placement <br />10.1 Impoundments 4. 1 Inspections and Certifications N. Other <br />11.1 SVeam Buffer Zones 5. 1 Impounding Swctures <br /> <br />C. Topsoil & Subsoil G. Use of Explosives <br />1 Blaster Certification <br />1 -1) <br />1. 1 Removal . <br />2. 1 Distance Prohibitions -2) <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection 3, 1 Blast Survey/Schedule <br />-3) <br />4 <br />l Redistribution q, I Warnings & Records <br />. 5. 1 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a. Date of Last <br />951e omplete 06/17/1998 <br />pe <br /> <br />4.0 a. Permit Review <br />~ <br /> <br />91.8 <br />~~ a. Total <br />bonded <br /> <br />0 <br />9047 <br /> <br />Frequency for previous 4 Calendar Qlrs. <br /> <br />b. Phase I . <br />a. Permitted <br />b. Number of Numberol <br />requred ^ oomplele ^ <br />wm late pact <br />4 <br />s 4 14.0 b. Inspection Time 0.0 released <br />91,$ h. Disturbed <br />inspections <br />conducted <br />13'0 <br />T <br />l Ti <br />~ U.U c. Phase II <br />rclensed (Estimated) <br />c. Number of Numberol c, <br />rave <br />me <br />requued partial ~-~ <br />partial g inspections g <br />2.0 <br />iti <br />d <br />R <br />n W <br />C 0.0 d. Phasc 111 <br /> <br />l <br />Page 1 of _ <br />mspections conducted u . <br />cpo <br />r <br />ng rc <br />cased ~,,,,,~~,,,,,,,d ~,, ~y„ <br />