My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC13113
DRMS
>
Back File Migration
>
Inspection
>
INSPEC13113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:14:45 PM
Creation date
11/18/2007 8:59:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Date
8/15/2001
Doc Name
MINE SITE EVALUATION
From
OSM
Inspection Date
7/18/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~iiiiiiii~iiiuii~ <br />999 <br />o~ ~~ <br />P <br />.1- <br />~.t , ,ea <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation RECEIVED <br />State <br />Aus <br />1. Permiltee/Person 9. Permit Number )jyjgj 10. Permit Type <br /> SENECA COAL COMPA*IY C-082-94 ~ PP <br />2. Address l 1. Field Visit Dale 12. Purpose 13. SRA Present <br /> P. O. BOX 670 07/18/2001 ~ ^Y <br />3. City 4. State mm - dd -yyyy <br /> <br />H <br />d <br />CO 14. Permit Status 15. Site Status 16. Facility Type <br />FF~~ <br />--- <br /> ay <br />en <br />A^ AP ~ <br />A <br />~ <br /> <br />5. Zip Code 6. Phone Number U <br /> 17. OSM Office # 18. CCID # 19. Land Code <br /> 81639 (970)276-3074 <br />140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> OS-00304 CO ROUTT <br />8. Mine Name <br /> 23. AV S Permittee Entity ID Number 24. State Office <br /> YOAST MINE <br /> D D <br />25. Hours 26. Si ature Block 27. Reviewing Ollicial: <br />8.0 a. Permit Review ~~ ~~ <br /> <br /> <br />8,p <br />b. Site Visit Time Sig ture: q <br />HENRY AUSTIN ID # 116 ~ / OI Signature: <br /> ` <br />6.0 c. Travel Time <br />Printed Name: Review Dale: $ / <br />~ / O <br /> mm - Ad -yyyy <br />1.5 d. Report Writing Date: 08/09/2001 is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />Oxx... Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF....Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surtace and underground coal mining activities have ceased and <br />A.... Active: Coal minin and reclamation activities occurrin or operator has left the site without completing reclamation as defined in <br />9 9 30 CFR 840.11(8) <br />ppermitted but not yet disturbed. AB1..gond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) Ag2..Partially Reclaimed Forfeiture: Forested site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond R=lease: Reclamation completetl and State Regulatory A83.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all or the bond (Phase III Release.) NA...Not Applicable: When site is unpermiffed. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determinetl. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Gomplele: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phose bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has ggranted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 GFR 816/ non of forfeited site is in progress. <br />have not begun. <br />l P 817.731(b). FR.. Forested and Reclaimed: Forfeiture <br />roducing: Coal surtace mining <br />AP.. Active Coa P1...Phase I FRelease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />qN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />(aciliN such as tipple or preparation plant <br />The Permit Stat <br />sit <br />i <br />i <br />acti <br />i <br />N P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />tir <br />f <br />th <br />itt <br />d <br />ti <br />o fin <br />ng: <br />us <br />s <br />ve, <br />e <br />s <br />NM.. or <br />e perm <br />area. <br />e en <br />e opera <br />ons have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamatan completed and the activity is not coveretl by the <br />mining activity, and site not regradetl. the RA has released all bond. reouired permits from the RA. <br />Facility Type Cotles -Item 16 D...Ancillary (Haulroad, Conveyor, antl/or Rails) H... Exploration Permits L... Remining site permitted <br />A... surtace E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K...Government Financetl Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeencv's <br />responsiveness to sma{I business I(you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance ac[iviues of OSM, call I-888-REG-FAIR (I-888-734-3247). a~•~aa o«<mk. a, inoe <br />
The URL can be used to link to this page
Your browser does not support the video tag.