Laserfiche WebLink
CE OI, SITRFACE Ii~IIl`~TIl®TG <br />~p~20 `~ N.~e Site Evaluation <br />~d <br />State Program <br />1. Pemrittee(Person psN°~~ 9. Permit Number 10. Pemnt Type <br /> BTU F,MPIRE CORPORATION C-044-81 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 701 MARKET ST, SUITE 733 03/15/2006 ~ ^Y <br />3. City 4. State mm - del - yyyy <br /> <br />CO 14. Petmit S[atus li. Site Status 16. Facility Type <br />Oak Creek IN TC BDEFG <br />~. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />80467 (970) 870-2712 <br />140 SF <br />7. Operator Name, if Different than Permittee r <br />N <br /> 20. M.S.H.A ID # 21. Stat ame <br />e Abrev. 22. County <br /> <br /> OS <br />01370 CO MOFFAT <br />i <br />N - <br /> ne <br />ame <br />8. M <br /> 23. AVS Pernuttee Entity ID Number 24. State Office <br />EAGLE 5 & 9 MINES <br /> 121108 <br />25. Hours 26. S' nature Block 27. Reviewin <br />g Of <br />icial: <br />4.0 a. Permit Review .. 3 2 0 f <br />~~// <br />~l/Jy-ac./ <br />~ <br />~~KF <br /> <br />p b. Site Visit Time <br />g S r afore: . <br />. <br />Signature: <br />, HENRY AUSTIN ID # 116 <br /> <br /> <br />p a Travel Time <br />g Review Date: ~ 1231 ZXp <br />, Printed Name: mm - del - yyyy <br />y,p d. Report Writing Date: 03/21/2006 Is Supplementa] MSE Page Used Y/N Y~ <br />Permit Type -Item 70 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />-Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />Oxx....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 Ajoint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 74 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. A61.. Bond Forfeiture: Bond forfeiture offcially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) Ag2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...BOnd Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase 1II Release.) NA...Not Applicable: When site Is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131 (b). FR..Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant P2.. Phase II Release: At least Phase II bontl release WC.YVildcak Coal mining and reclamation <br />it St <br />itt <br />ti <br />Th <br />P <br />t <br />i <br />i <br />t <br />i <br />f <br />th <br />ti <br />d <br />~ <br />h <br />t <br />k <br />l <br />d <br />ve, si <br />e <br />erm <br />a <br />us <br />s act <br />e <br />s <br />or <br />e en <br />re perm <br />e <br />area. <br />opera <br />ons <br />ave or are <br />a <br />ing p <br />ace an <br />NM..No Mining: <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining actively, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR786.25 <br />B... Underground F... Loading Facility and/or Tipple J...'Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (S~REFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Re;ional Fairness Boards «~ere established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenc 's <br />responsiveness to small business. if you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />_ <br />and wish to corrunent on the enforcement or compliance activities of OSM, call I-888-REG-FAIR (1-888-734-3247). Re„~~o~«mta a, r9sa <br />