Laserfiche WebLink
M- l~~l`l-Ol4 <br />5 I ~I o4 <br />July 29, 2004 <br />Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Co 80203 <br />RECEt~/ED <br />JUL 3 0 2004 <br />Dlviaion et Minerals ~ Geolapy <br /> <br />AGGREGATE <br />INDUSTRIES <br />RE: DMG Inspection -Deer Creek Quarry <br />James - --- -- -- - -- - - - - - -- -- <br />Per our conversation on June 18, 2004, Aggregate Industries request a <br />90-day extension on the following item pertaining to Deer Creek: <br />Submit a plan, with specific construction details and an <br />abatement timetable to the Division as a Technical Revision by <br />the corrective action date. Or submit evidence that the current <br />facility is adequately constructed to contain the entire volume of <br />the tank plus 33%. <br />As, I stated to you, this containment requirement is inconsistent with the <br />requirements of the Clean Water Act's -Spill Prevention Control and <br />Countermeasure's plan (SPCC). We understand that this is something <br />the DMG will be working on to amend/address in their Spill Policy. We <br />look forward to working with the DMG on addressing these issues in the <br />Spill Policy to make them consistent with the requirements already <br />enforced by the CDPHE and EPA. The extension should provide <br />adequate time to address this issue with Colorado Rock Products <br />Association and the DMG. Please call me if you have any questions. <br />Thank you! <br />Sincerely, <br />~~,~~~~ <br />Jamie Gaboriau <br />Environmental Compliance Manager <br />Cc: Mike Refer <br />file <br />Aggregate Industries <br />West Central Region, Inc. <br />1707 Cole Blvd., Suite 100 <br />Golden, CO 80401 <br />Telephone: 303-985-1070 An Equal Opportunity Employer <br />