Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Pennittee/Person 9. Permit Number 10. Permit Type <br /> SENECA COAL COMPANY s C-082-94 ~ PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> PO BOX 670 I pAinerals b Oeolo9y 06/22/2006 ~ ~Y <br />3. City 4. State mm - dd - yyyy <br /> 14. Permit Status 15. Site Status I6. Facility Type <br />Hayden CO <br />ADG <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81639 (970)276-5106 <br />140 SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> ~ CO ROUTT <br />Mine N <br />me <br />8 <br /> a <br />. <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />YOAST MINE <br />25. Hours 26 ignature Block 27. Reviewing Official: <br />2.0 a. Permit Review <br /> Sigu lure: ~ 113 D (p Signature: <br />0 b. Site Visit Time <br />6 <br />. HENRY AUSTIN H) # 116 <br />2,0 c. Travel Time <br />Printed Name: Review Date: 7 / ~ / d 6 <br /> mm - dd - yyyy <br />1.0 d. Report Writing Date: 07/11/2006 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />p~„.,Oversight RFx.... Reclamation Fees CC....., Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx.,... Federal Actions CCF....Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: Ali surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermined but not yet disturbed. ~ ABt.. Bond Forfeiture: Bond forfeiture offcially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamafion in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamafion activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR.., good Release: Reclamation wmpletetl and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />i <br />A <br />W <br />i <br />i <br />...Not Applicable: <br />hen s <br />te <br />s unperm <br />tted. <br />Authority (RA) has released all of the bond (Phase III Release.) N <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The R4 is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has Rranted pertormance bond(s), and/or reclama- <br />have started and where coal minin <br />o <br />erations cessation of minin <br />ursuant to 30 CFR 816/ lion of forfeited site is in <br />ro <br />ress <br />g <br />p <br />g p <br />p <br />g <br />. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />C <br />l <br />R <br />l <br />l <br />AP.. Active <br />oal Producing: Coa <br />surface mining P1...Phase I <br />ease: At <br />east Phase I bond release reclamation completed. <br />e <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN., Active Non-Producing: Active non-producing permits, partial bond release. is permined but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.W~Idcat: Coal mining and reclamation <br />NM,.No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not Covered byy the <br />mining activity, and site not regraded. the RA has released all bond, required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L... Remining site ppermined <br />A <br />rf <br />S <br />f <br />... <br />u <br />ace E... Re <br />use and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles X...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and ] 0 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc s <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />_ <br />and wish to comment on the enforcement or compliance activities of OSM, cat( 1-888-REG-FAIR (1-888-734-3247). ac~isea o.~~x.a, isle <br />