Laserfiche WebLink
<br />Inspection Date:iJuly 13 & 15, 1983 <br />David C. Shelton <br />Director <br />STATE OF CDl0R4D0 9iC M>AD D. LAMM. Gov wno. <br />DEPARTMENT OF NATURAL RESOURCES III ^Iti ~t~~~'~~""' <br />D. Monte Pascoe, Exe<utive Director 999 <br />MIlVED LAND RECLAMATION <br />423 Centennial Builtling,1313 Sherman Slreet <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />COAL INSPECTION REPORT <br />operation: Red Canyon Mine <br />Fite No.: C-034-81 <br />operator Name: Grand hlesa Coal Company <br />Permittee Name: Same _ <br />Address: P.O. Box 226, 1st and Columbia <br />Delta, Colorado 81416 . <br />county: Delta <br />Type of Operation: UG <br />Federal X <br />Inspector: <br />r 1 <br />LJ <br />X Surface <br />Pri va to <br />Dan Mathews <br />weather: warm and clear <br />Time: 3'00 a.m. <br />Type of Inspection: Complete ~ Partial <br />Operator Conka,_t: - arrV R c-hk <br />I. CeneraZ Comments <br />A complete inspection of the mine and the proposed permit area at she Delta load-out ;was conduc` <br />on July 13, 1983. Mr. Bennet Young of the OSM Western Technical Center accompanied the <br />inspector for the purpose of familiarizing himself with the site. Mr. Young is the OSM <br />project leader for the Red Canyon Permit Review. <br />A follow-up inspection was conducted on July 15, 1983 to check resolution of a diversion ditch <br />problem noted in the June inspection which had not been corrected on July 13, 1983. The <br />resolution deadline was July 15, 19II3, but the ditch had not been regraded .as required. <br />NOV 83-25 will be issued as a result. <br />r <br />