Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
1/20/2004
Doc Name
Response to PB
From
CC & V
To
DMG
Inspection Date
11/23/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C C Cripple Creek & Victor Gold Mining Company <br />A Joint Venture - ANGLOGOLD (COLOR4D0) corzP., Manager <br />~.7C.~ Operations Office <br />P.O. Box 191 • 100 North 3rd Street <br />Victor, Colorado 80860 <br />(719) 689-2977 ~ Fax (719) 689-3254 <br />Sent Certified Return Receipt Requested <br />7002-2410-0002-6718-5438 <br /> <br />January 16, 2004 <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver Colorado 80203 <br /> <br />Permit #:1~~f4~ Confidental?: <br />Class:_ Type-Seq.:_~ <br />From: ,To: ~ <br />Doc. Name ~6' ~~~' r 2.1_{~'3r_ <br />Doc. Date (if no date stamp): D p~ <br />Re: Mining Permit M-1980-244, Cripple Creek & Victor Gold Minin¢ Companv <br />(CC&V). Cresson Project, Valley Leach Facility (VLF), Phase N Low Volume Solution <br />Collection System (LVSCS) <br />Deaz Mr. Keffelew: <br />CC&V completed construction and commenced operation of the Phase N Pregnant <br />Solution Storage Area (PSSA) of the VLF in the spring of 2003 and completed the Phase <br />Nb ore storage azea and commenced operation in the fall of 2003. The construction was <br />completed in accordance with approved specifications and Certification Reports were <br />filed with and approved by the Division of Minerals and Geology. <br />The Phase IV LVSCS is designed and installed as part of the triple lined containment <br />system for the Phase N PSSA. LVSCS operation includes the collection, capture and <br />pumping of low volume solutions. The LVSCS has operated routinely since <br />commencement of Phase N VLF operations. Inflow rates and pumping rates at the <br />LVSCS have varied as expected during VLF operations. <br />CC&V observed increased flow rates into the LVSCS following ore loading in the <br />vicinity of the Phase N PSSA . The placement of approximately 120 feet of ore <br />increased pore pressure on the LVSC gravel fill in between the upper and lower synthetic <br />liners, thus reducing pore space, and pushing water to the LVSCS sump and pumps. As <br />previously discussed with DMG, the increased flow is primarily a result of movement of <br />meteoric water trapped between the upper and lower synthetic liners during the <br />construction period. <br />The LVSCS was open to the atmosphere during construction for a period of <br />approximately 7 months. During this time period, approximately 7 inches of precipitation <br />