My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01857
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:02 PM
Creation date
11/18/2007 8:02:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Inspection
Doc Date
1/11/1999
Doc Name
OSM MINE SITE EVALUATION STATE PROGRAM
Inspection Date
12/16/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOF ~~~ <br />OFFICE OF SURFACE N~ Ep <br />Mine Site Evaluation <br />State Program JAN 11 1999 <br />>• pia <br />o~~i <br />~OFSURFACE~` <br />I. Permittee/Person 9. PermitN~11Si000/MI0 ~~ 10. Permit Type <br /> CYPRUS EMPIRE CORP. C-044-81 ~ PP <br /> 2. Address l 1. Field Visit Datc 12. Purpose l3. SRA Present <br /> P.O. BOX 68 12/16/1998 <br />3. City 4. State mm-dd -yyyy <br /> 14. Permit Status I5. Site Status 16. Facility Type <br />Craig CO ~ AN <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81625 303-824-8246 140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> MOFFAT <br /> 05-01370 CO <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />EAGLE 5 & 9 <br /> 121108 <br />25. Hours 26. Sig lure Block 27. Reviewing O1Ticial: <br />8.0 a. Permit Review <br /> <br />10.0 b. Site Visit Time Si azure: Signature: <br /> HENRY USTIN ID # 116 <br /> P <br />Travel Time <br />0 c <br />10 Review Date: I <br />ZL 98 <br />. <br />. Printed Name: mm - dd -yyyy <br />2.0 d. Repon Writing Date: 12J2ll1998 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 70 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Refertal (non site visit) <br />0~,., Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF....Citiz~n Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time dudng the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining ectivites have ceased and <br />operator has left the site without completing reclamation as delined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 640.11(8 <br />ermitted but not <br />et disturbed <br />A81 <br />B <br />d F <br />d <br />it <br />~ <br />ffiG <br />ll <br />d F <br />d <br />i <br />i <br />d <br />d <br />P <br />. <br />y <br />.. <br />on <br />o <br />e <br />ure: <br />on <br />ture o <br />a <br />y <br />n process or complete <br />o <br />e <br />, an <br />. <br />IN.... nactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Intenm Program Permit) AB2..Partially Reclaimed Forfeiture: Fodeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Fodeiture: Forteited site that has been reclaimetl to Program standards. <br />N <br />A...Not Applicable: When site is unpermitted. <br />Authority (RA) has released all of the bond (Phase III Release.) <br />Site Status Codas -Item 15 <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Fodeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has Qranted pperlormance bond(s), and/or reclama~ <br />ress <br />h <br />i <br />i <br />t <br />rt <br />d <br />l <br />ti <br />f <br />t t <br />30 CFR 876/ G <br />f f <br />f <br />i <br />d <br />i <br />i <br />i <br />d <br />ti <br />m <br />n <br />ng pursuan <br />. <br />ave s <br />a <br />an <br />where coa <br />mining opera <br />ons cessa <br />on o <br />o <br />on o <br />or <br />e <br />n prog <br />e <br />te <br />s <br />te <br />s <br />h <br />FR <br />rt <br />i <br />t <br />b <br />F <br />d <br />F <br />A <br />ei <br />ure <br />ave not begun. 817.131( <br />). <br />.. <br />o <br />e <br />ted and Reclaime <br />: <br />o <br />AP <br />A <br />ti <br />l <br />f <br />i <br />P <br />l <br />At l <br />t Ph <br />I b <br />l <br />C <br />l <br />C <br />i <br />RR <br />d <br />l <br />i <br />l <br />d <br />.. <br />ve <br />sur <br />ace m <br />ng <br />e <br />ease: <br />eas <br />ase <br />on <br />re <br />ease rec <br />amat <br />c <br />oa <br />Producing: <br />oa <br />n <br />1...Phase I <br />on comp <br />ete <br />. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facili1y such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcal: Coal mining and reclamation <br />l <br />i <br />i <br />i <br />d <br />Wi <br />i <br />ti <br />d <br />ace an <br />re perm <br />NM..No <br />n <br />ng: The Permit Status <br />s ac <br />ve, site is for the ent <br />tte <br />area. operations have or are Cakingg p <br />i <br />T <br />i <br />rt <br />l <br />R <br />l <br />R <br />l <br />ti <br />l <br />d th <br />h <br />i <br />lh <br />not <br />n <br />emporary Cessat <br />on, no su <br />e <br />ease: <br />ec <br />ama <br />on comp <br />e t <br />vity is not covered byy <br />e <br />ace coa <br />P3.. Phase III <br />eted an <br />e act <br />_ mining activity, and site not regraded. RA has released all bond. required permits from the F7A. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site ppermitted <br />A... Sudace E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR786.26 <br />8... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K...GOVemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency en(orcemen[ actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with 500 or (ewer employees including those of affiliates) page I of <br />and wish to comment nn the enforcement or compliance acti vines o(OSM, call I-888-REG-FAIR (I-838-734-3247). n~.,,~o.,,,k, i. ivys <br />
The URL can be used to link to this page
Your browser does not support the video tag.