Laserfiche WebLink
Loyd V. "Buck" Barn~art ~II ~~~~~~~~~~~~~~~~ <br />212 West 13th, Pueblo, Colorado 81003 <br />Office: (719) 543-1324 Home: (719) 542-9207 • Fax: (719) 543-1329 <br />November 27, 1998 <br />Mr. Jim Stevens <br />Division of Minerals and Geology ~ ~=INFO <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 '''a <br />3 Ge010Qy <br />Re: File # M-77-196, Buena Vista Pit <br />Hard Rock Paving and Redi-Mix, Inc. <br />Dear Jim: <br />This will address the problem items of your inspection of 9/l0/98 spelled out on page 3 of your <br />report "Problems/Possible Violations and Corrective Actions." Information will be supplied in [he <br />same sequence as listed in your report. <br />1. Anew survey map has been prepazed by Arkansas Valley Surveying of Buena Vista and is <br />attached for your files. This replaces the eazlier survey map by the same company, which did not <br />indicate the entire 9.5 A affected area, since i[ had not been determined a[ that time. I feel that the <br />surveyor has done an excellent job, which will make it easier for all of us involved to stay in <br />compliance. You will notice that 9.5 A is the affected azea which alleviates any concern about being <br />outside the permit area. Gary Reed indicates that present plans aze to get the boundazies mazked in <br />the coming week for easy visual location. I have taken the permit area out of the blueprint and put <br />in on an easier size to work with. Essential details have been highlighted. <br />2. Gary says he also plans [o address the separation and preservation of the topsoil stockpile next <br />week with at least a berm. The company understands the value of this topsoil in reclamation. <br />3. Attached is an updated reclamation cost proposal for this operation in the amount of $16,440.00. <br />The company feels that this will be adequate. Please advise us if you agree with this amount. If you <br />do, the company will start the process with their bonding company to supply this. <br />