Laserfiche WebLink
' * COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> ,,876 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1997-011 Site Name: Baculite Mesa Pit <br /> County Pueblo TR# (DRMS Use only) <br /> TR-2 <br /> Permittee: Baculite Mesa LLC JLC/AME RECEIVED <br /> Operator(If Other than Permittee): ,IAN 3 0 2026 <br /> Permittee Representative: Fred Orr DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> Please provide a brief description of the proposed revision: This Technical Revision is to, 1) increase <br /> the maximum allowed disturbance, 2) increase the maximum working high wall length, 3) include <br /> and 5) increase the bond to cover existing disturbance & 6) correct permit boundary to match permit <br /> atPragP Attached is a TR explanation letter for these changes <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 —✓ <br /> 112 hard rock (not DMO) $175 i I <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />