Laserfiche WebLink
RULE 3 PERFORMANCE BOND <br /> <br />South Taylor/Lower Wilson – Rule 3, Page 1 Revision Date: 6/4/25 <br /> Revision No.: MR-264 <br /> <br /> <br /> <br />RULE 3 – PERFORMANCE BOND <br /> <br />The performance bond calculations for the entire Colowyo mining operation can be found in Exhibit 13A <br />in Volume 13. The cumulative bond schedule for the Collom mining area can be found Exhibit 13C in <br />Volume 20. The Bond Calculation Maps showing the Worst Case Topography and Regraded <br />Topography are included as Map 35A and Map 36A, respectively. Bond Calculation Cross Sections are <br />provided on Map 39.