Laserfiche WebLink
Years:1-5 6-10 <br />EXTRACTION <br />Pit Total Reserves (tons)Sand and Gravel Mined (tons ±) <br />P125_S1 640,748 640,748 <br />P125A 1,202,528 1,202,528 <br />P125B 2,247,893 1,356,724 891,169 <br />Total:4,091,169 3,200,000 9,169 <br />Length(ft)Pit Wall Created (ft ±) <br />P125_S1 3,129 3,129 <br />P125A 5,177 5,177 <br />P125B 5,963 3,843 2,120 <br />Total:14,269 12,149 2,120 <br />RECLAMATION <br />Length(ft)Pit Wall Regraded (ft ±) <br />P125_S1*3,129 0 <br />P125A 5,177 5,177 <br />P125B 5,963 0 5,963 <br />Total:14,269 5,177 5,963 <br />Length(ft)Pit Wall Remaining (ft ±) <br />P125_S1 3,129 0 <br />P125A 5,177 0 <br />P125B 5,963 3,843 0 <br />Total:14,269 3,843 0 <br />Table E-1: Mining-Regrading Schedule <br />*Pit P125_S1 will be backfilled as soon after extraction as practically possible . Pit walls will not be regraded to <br />reclaimed conditions, but will be left as mined until backfilled.