Laserfiche WebLink
Battle Mountain Resources,Inc. <br /> San Luis Project RECEIVED <br /> P.O. Box 310 <br /> San Luis, Colorado 8 1 1 52-03 10 OCT 10 2024 <br /> (719) 379-0798 <br /> Colorado Division of Reclamation, <br /> Mining and Safety <br /> October 8, 2024 <br /> Mr. Lucas J. West <br /> Colorado Department of Reclamation, Mining, & Safety <br /> 1313 Sherman,Room 215 <br /> Denver, CO 80203 <br /> Re: Battle Mountain Resources, Inc. <br /> San Luis Project-M-88-112 <br /> Third Quarter 2024 Concentration Time Series Charts <br /> Dear Mr. West: <br /> Please find the enclosed Battle Mountain Resources, Inc. "San Luis Project" (M-88-112) updated <br /> concentration time series charts for the third quarter of 2024. Concentration charts are provided for the <br /> eight groundwater monitoring wells, as specified in the TR-26 final performance monitoring program and <br /> in the groundwater monitoring program specified in permit revision TR-32. Please note that for BF-6, the <br /> pump column had failed and a sample was not collected in September. The pump column was replaced at <br /> the end of September and sampling will resume in October. For BF-4, the well casing has failed and a <br /> replacement well is being permitted and then will be drilled. <br /> Should any questions arise or if I can be of any assistance providing clarification, please call me at (719) <br /> 379-0538. <br /> Sincerely, <br /> PP I,,.,,o <br /> Julio Madrid <br /> Authorized Agent <br /> Battle Mountain Resources, Inc. <br /> Cc: BMRI File <br /> Devon Horntvedt, Newmont USA Limited <br /> Tim Runnells,Engineering Analytics <br />