My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-13_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2024-06-13_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:17:20 PM
Creation date
6/13/2024 2:16:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
6/13/2024
Doc Name
Incompleteness Notice
From
DRMS
To
Thorin Resources, LLC
Type & Sequence
TR17
Email Name
LJW
THM
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />June 13, 2024 <br /> <br />Sturges Karban <br />Thorin Resources, LLC <br />1900 Main St. Unit #1 <br />Ouray, CO 81432 <br /> <br />RE: Revenue Mine - File No. M-2012-032, <br /> Technical Revision (TR-17) <br /> Technical Revision <br /> <br />Dear Sturges Karban: <br /> <br />On June 10, 2024, the Division of Reclamation, Mining and Safety received your 112d-1 Hard Rock <br />Reclamation Permit Technical Revision application for the Revenue Mine, which is located in Ouray <br />County. Preliminary review of the information received determined that the following additional <br />information must be received before the Division can consider your application complete and technical <br />review can begin. Thus, your application is incomplete for the purposes of filing as of June 13, 2024. <br /> <br />1. The Request for Technical Revision (TR) Cover Sheet was submitted incorrectly, listing FAFO Holdings, <br />LLC as the Operator not Thorin Resources. Please provide a replacement TR Cover Sheet with the correct <br />Permittee Name. <br />2. Included with the Application Materials was a check for $216.00 which is consistent with the Technical <br />Revision Application Fee for Construction Materials Operations. The Technical Revision Fee for a <br />Designated Mining Operation is $1006.00. Please provide proper payment of $790.00 for a total of <br />$1006.00. <br /> <br />You have thirty (30) days from June 13, 2024 to submit all necessary documents that the Division needs for <br />the application to be considered filed. If, at the end of the thirty day period, the application has not been <br />determined to be complete and filed, the Division may deny the application and terminate the application file. <br /> <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. <br />The Division will review your application to determine whether it is adequate to meet the requirements of <br />the Act after submittal of all required items. <br /> <br />If you have any questions, please contact me by telephone at 303-866-3567 x 8187, or by email at <br />Lucas.west@state.co.us. <br /> <br />Sincerely, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.