Laserfiche WebLink
Page 1 <br /> 6.4.4 EXHIBIT D — Mining Plan <br /> The mining plan shall supply the following information, correlated with the <br /> affected lands, map(s) and timetables: <br /> (a) description of the method(s) of mining to be employed in each <br /> stage of the operation as related to any surface disturbance on <br /> affected lands; <br /> (b) earthmoving; <br /> (c) all water diversions and impoundments; and <br /> (d) the size of area(s) to be worked at any one time. <br /> (e) An approximate timetable to describe the mining operation. The <br /> timetable is for the purpose of establishing the relationship between <br /> mining and reclamation during the different phases of a mining <br /> operation. An Operator/Applicant shall not be required to meet specific <br /> dates for initiation, or completion of mining in a phase as may be <br /> identified in the timetable. This does not exempt an <br /> Operator/Applicant from complying with the performance standards of <br /> Section <br /> 3.1. If the operation is intended to be an intermittent operation as <br /> defined in Section 34-32.5-103(11)(b)7 C.R.S., the Applicant should <br /> include in this exhibit a statement that conforms to the provisions of <br /> Section 34-32.5-103(11)(b)7 C.R.S. Such timetable should include: <br /> (i) an estimate of the periods of time which will be required for <br /> the various stages or phases of the operation; <br /> (ii) a description of the size and location of each area to be <br /> worked during each phase; and <br /> (iii) outlining the sequence in which each stage or phase of the <br /> operation will be carried out. (Timetables need not be separate <br /> and distinct from the mining plan, but may be incorporated <br /> therein.) <br /> (f) A map (in Exhibit C - Pre-Mining and Mining Plan Maps(s) of Affected <br /> Lands, Subsection 6.4.3) may be used along with a narrative to <br /> present the following information: <br /> (i) nature, depth and thickness of the deposit to be mined and the <br /> thickness and type of overburden to be removed (may be <br /> marked "CONFIDENTIAL," pursuant to Paragraph 1.3(3)); and <br /> (ii) nature of the stratum immediately beneath the material to be <br /> mined in sedimentary deposits. <br /> (g) Identify the primary and secondary commodities to be <br /> mined/extracted and describe the intended use; and <br /> (h) name and describe the intended use of all expected incidental <br /> products to be mined/extracted by the proposed operation. <br /> (i) Specify if explosives will be used in conjunction with the mining (or <br /> reclamation). In consultation with the Office, the Applicant must <br /> demonstrate pursuant to Subsection 6.5(4), Geotechnical Stability <br /> Exhibit, that offsite areas will not be adversely affected by blasting. <br /> RAPTOR MATERIALS, LLC. PARCEL 122— RESOURCE DEVELOPMENT PROJECT APRIL 2024 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION,MINING&SAFETY <br /> TECHNICAL REVISION 03 <br />