Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />February 15, 2024 <br /> <br /> <br />Kevin Peart <br />Holcim - WCR, Inc. <br />1687 Cole Blvd., Suite 300 <br />Golden, CO 80401 <br /> <br /> <br />Re: Morrison Quarry - File No. M-1973-021 <br /> Holcim - WCR, Inc. <br /> Technical Revision (TR-9) <br /> Morrison Quarry TR09 <br /> <br />Dear Kevin Peart: <br /> <br />On February 15, 2024 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on October 31, 2023, addressing the <br />following: <br /> <br />Modify the mining plan and reclamation plans below elevation 6,600 in an area referred to as the <br />Satellite South Pit. TR also updates the drainage plan for the South Quarry; removes the <br />horizontal drain from the reclamation plan; and modifies the existing groundwater monitoring <br />requirement and existing monitoring wells. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 9 approved by the Division are hereby incorporated into Permit <br />No. M-1973-021. All other conditions and requirements of Permit No. M-1973-021 remain in full <br />force and effect. <br /> <br />The revised liability amount exceeds the financial warranty currently held (see below), please submit <br />additional bond or a rider to your existing bond that equals or exceeds the Revised Liability. The <br />revision will not be final until the bond is approved by the Division. <br /> <br /> <br />Bond Held: $7,847,335.00 <br />Prior Liability: $7,847,335.00 <br />Change in Liability: $22,886,600.00 <br />Revised Liability: $30,733,935.00 <br />Prior Permit Acreage: 364.80