Laserfiche WebLink
a•cozo <br /> 1„ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> ,� ��� 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> 1s7s <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET TR-1 <br /> AMGIJLE <br /> File No.: M- 2006-077 Site Name:Morgan Pit <br /> County H u e rfa no TR# ,(DRMS Use only) <br /> Permittee:Paul Morgan Excavating, Inc. RECEIVED <br /> Operator(If Other than Permittee): <br /> Paul Morgan JAN 2 3 2024 <br /> DIVISION OF RECLAMATK.�: <br /> Permittee Representative: MINING AND SAFTEY <br /> Please provide a brief description of the proposed revision: <br /> Please update the mine plan and reflect a southward progression of mining, allowing for highwalls throughout the <br /> mining area, including but not limited to the sides. Currentlly calculated highwalls are 796 feet. The east and <br /> west highwalls will be reclaimed as we move southward. If unsatisfactory material Is encountered, I will then <br /> plan to move eastward where better material could be found. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />