Laserfiche WebLink
RECEIVED <br /> (®•�'' T H 0 R I N JAN 0 4 2024 <br /> Colorado Division of Reclamation, <br /> Mining and Safety <br /> Thorin Resources, LLC <br /> FAFO Holdings LLC <br /> 1900 Main Street Unit 1 Ouray,Colorado <br /> 970.316.2294 <br /> December 28,2023 <br /> Subject: Revenue Mine, Permit M-2012-032, request to exit Temporary Cessation and Resumption of <br /> Mining Operations <br /> Thorin Resources,LLC(parent company FAFO Holdings LLC)hereby and herein proposes to resume <br /> mining and milling operations at its wholly owned mine and mill facility,the Revenue Mine,approximately <br /> 5 miles from the city of Ouray, Colorado, immediately off Highway 361, Ouray County, Colorado. The <br /> proposed resumption of mining activity shall be January 19th, 2024 with a recommissioning of the mill <br /> following approximately June 15th,2024. Mining, in the context of this proposal,shall be limited to,what <br /> we are prepared to quantify,as previously mined and milled material,including waste materials previously <br /> mined and milled by others; predating Thorin's involvement.with the Revenue Property. <br /> As discussed, and proposed, herein Thorin Resources, LLC proposes a scaled-up approach to the <br /> resumption of mining activity,and ultimately milling activity,such that operators become proficient in new <br /> mining and processing activities, and streamline processing activities on a small scale,the intent being to <br /> prove what we know, learn what we do not know, with an error-free record of accomplishment. Any <br /> revisions requiring approval will be submitted as Technical Revisions within operational rules and <br /> regulations. <br /> PHASE 1: <br /> Utilizing the existing 18,000 square-foot warehouse,located at 1900 Main Street,Ouray,Colorado, <br /> a portion of said warehouse shall be utilized as a temporary, closed-loop, processing facility. Within the <br /> 18,000 square foot building an area of 800 square feet shall be designated as R&D 1. The perimeter of <br /> R&D 1 shall be lined with double stacked water-resistant sandbags forming a rectangle 20 feet x 40 feet x <br /> 1.5 feet;this constitutes a water capture area, or containment, possessing a volume of 8,976 U.S. Gallons <br /> (USG)of water which is equivalent to 359 times more volume than 1 minute of operating time (1 minute <br /> of operating time equaling 25 U.S. Gallons (USG)of water), in effect proposed containment could retain a <br /> total system spill for 5.9 hours Given other safe guards we are confident this is sufficient. All equipment <br /> both static, such as tanks and valves, and dynamic, such as pumps shaker tables, etc. shall be located <br /> within the containment area, with one exception; that being a 'panic button' type pneumatically <br /> controlled,water shutoff valve located at the main water source. In the closed-loop test, portal discharge <br /> water will be transported from the mine site in suitable transport containers. Water for the closed-loop <br /> test would be representative of the water for the actual process. During the closed-loop test, water <br /> samples will be drawn before and after processing. These samples will be sent to a laboratory for ABA <br /> testing. Phase 1 is R&D work only. <br />