My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-07_PERMIT FILE - C1981019 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2022-11-07_PERMIT FILE - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 8:17:25 PM
Creation date
8/25/2023 8:15:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
11/7/2022
Doc Name
List of Exhibits
Section_Exhibit Name
Volume 20 List of Exhibits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revision Date: 9/22/22 <br /> Revision No.: TR-156 <br />LIST OF EXHIBITS – VOLUME 20 <br /> <br /> <br />Exhibit 10, Item 6 Proposed Collom Coal Mine Project Baseline Vegetation Survey, <br />May 2006, Cedar Creek Associates, Inc. <br /> <br />Exhibit 10, Item 7 Wetlands and Waters of the US Delineation for Collom Project, <br />May 2006, Cedar Creek Associates, Inc. <br /> <br />Exhibit 11, Item 1 Wildlife Survey Report for the Collom Permit Study Area, August <br />25, 2006, Cedar Creek Associates, Inc. <br /> <br />Exhibit 11, Item 2 2007 Wildlife Monitoring Report for the Collom Permit Study <br />Area, December 20, 2007, Cedar Creek Associates, Inc. <br /> <br />Exhibit 13C Cumulative Bond Collom Haul Road and Facilities <br /> <br />Exhibit 14, Item 7 Pre-Blast Survey – Structures within ½ Mile of Collom Mining <br />Area (Pending) <br /> <br />Exhibit 14, Item 8 Pre-Blast Survey – Offering Letters <br />Pre-Blast Structure Locations Drawing <br /> <br />Exhibit 23, Item 1 Geotechnical Report for the Temporary Spoil Pile <br /> <br />Exhibit 23, Item 2 Addendum to Geotechnical Analysis <br /> <br />Exhibit 23, Item 3 Geotechnical Report for the Collom out of Pit Dump and Final <br />Reclaimed Surface <br /> <br />Exhibit 23, Item 4 The Adequacy of the Natural Sorted Spoil Material for the Purpose <br />of a Rock Drain in Little Collom Draw <br /> <br />Exhibit 25 Item 1 Groundwater Monitoring Well Information <br /> <br />Exhibit 26, Item 1 Alluvial Groundwater Monitoring Well Information <br /> <br />Exhibit 27, Item 1 Collom Haul Road Geotechnical Drilling <br /> <br />Exhibit 27, Item 2 Wilson Reservoir Geotechnical Drilling <br /> <br />Exhibit 27, Item 3 Collom In Pit Drilling <br /> <br />Exhibit 27, Item 4 Collom Topsoil Depth Testing <br /> <br />Exhibit 27, Item 5 Collom Facilities Geotechnical Drilling
The URL can be used to link to this page
Your browser does not support the video tag.