Laserfiche WebLink
PERMIT BOUNDARY/AFFECTED LANDS <br />200 FOOT LIMIT <br />TT COMMUNICATION LINES <br />❑HE OVERHEAD POWER LINES <br />FENCE <br />ABANDONED RAILROAD GRADE <br />W WATER LINE <br />-1R- — IRRIGATION LINES <br />FO FO FIBER OPTIC LINES <br />G c GAS LINES <br />FD UNDERDRAIN (Approximate Location) <br />PAVED ROADS (OFFSITE) <br />�■ ROADS (HAUL, ACCESS) (TYP.) <br />RIVER <br />DITCH <br />NOTES <br />1. The four Phases shown on this map are the operations areas for the <br />mining and reclamation activities that constitute the development of <br />this property as a series of water storage reservoirs. <br />2. Activities within each Phase will include, but is not limited to, mining <br />of sand and gravel, construction of reservoir liners, grading, resoiling <br />and revegetation of the above -water perimeter areas of said <br />reservoirs. <br />3. The Plant Site shown in the Phase 4 will be used throughout the life <br />of the mine and activities may include, but are not limited to, <br />processing the sand and gravel (crushing, washing and screening) ; <br />crushing and recycling of concrete and asphalt materials; batching of <br />ready -mixed concrete; batching of hot -mix asphalt; stockpiling of raw <br />and finished products, and sales of said materials. <br />4. The Plant Site shall include the necessary portable processing plants <br />and equipment to conduct the activities listed above. For the sand <br />and gravel processing, and the concrete and asphalt recycling, the <br />processing equipment shall include, but is not limited to, crushers, <br />screens, conveyors, stackers, feeders, log -washers, and other <br />necessary processing equipment. For ready -mixed concrete, and <br />hot -mix asphalt, a portable concrete batch plant and a portable <br />asphalt batch plant may be installed and used for the life of the mine. <br />5. The conveyor crossing envelopes shown on this map are the approved <br />proposed crossings in the Town of Platteville PDP agreement. The <br />conveyor design and final locations will be approved prior to <br />construction of the conveyors. <br />6. The approximate locations of (2) Conveyor Crossing Envelopes are <br />hown hereon. The exact location and size of the crossing areas will be <br />determined prior to installation. A Technical Revision will be filed <br />showing the exact location if different fro m shown on the Map <br />Exhibit C-1 Mining Plan Map. These crossings will be used, when <br />approved by the Town of Platteville, to build overhead portable <br />conveyor facilities to transport raw material from the north side of <br />County Road 32.5 to the processing plant. Using over -the -road <br />conveyors would greatly reduce heavy off-road truck traffic that <br />would cross the paved road. Conveyor facilities will be removed when <br />reclamation is complete. <br />PREPARED BY: ENVIRONMENT, INC. <br />7985 VANCE DR., # 205A <br />ARVADA, CO 80003 <br />(303) 423-7297 <br />Environment-incOoutdrs. net <br />LFEEND <br />t FP i FLOOD PLAIN <br />-- — SLURRY WALL (PROPOSED) <br />Tos ToS - TOP OF MINING SLOPE <br />■ BUILDINGS <br />133228 WATER WELL <br />OWNER: PUBLIC <br />SER VMb <br />COMPANYOFCOLORADO <br />BENHUDSON \ <br />1 <br />O OIL/GAS WELL <br />ESTIMATED MINING DIRECTION <br />PUBLIC ROAD RIGHT OF WAY <br />RESERVOIR SLOPE AREAS VARIES 3:1 TO 4:1 <br />BANK ARMORING (Approximate Location) <br />WORKING FACE AREA <br />TEMPORARY SOIL PILES (APPROX. LOCATIONS) <br />7. The reservoirs will have gravel access roads around the perimeters of <br />each reservoir and the rest of the perimeter area will be revegetated <br />with a state -approved seed mix. <br />8. Access points for each Phase are shown on this map. The accesses to <br />the Phases will be used to move equipment, needed during mining and <br />reclamation, from one area to the other. The access point into the Plant <br />Site from County Road 21 will be used by customers' over -the -road <br />trucks to transport finished materials to market. <br />9. Each Phase may continue to be used for agricultural purposes until the <br />permitted mining operations begin in the area. <br />10. The FEMA Flood Plain (Zone A) shown hereon is approximate and <br />represents the best information available at the time this document was <br />created and is subject to change. <br />11. The four mining Phases shown hereon may change as mining and <br />reclamation progresses, depending on future Oil and Gas activities at the <br />site. <br />12. Working faces show on the map are located at points where they will be <br />the longest in each Phase. Volume shown is based on average depth of <br />the Phase. <br />13. The approximate access points for each Phase are shown hereon. These <br />accesses will be used to move equipment, and access each Phase during <br />mining, development and maintenance of each Phase. <br />14. The unmined areas shown hereon may be used during mining and <br />reclamation for placement of soil stockpiles, staging areas and as <br />setbacks. If disturbed, they will be reseeded. <br />15. The settling and freshwater ponds shown in Phase 1 will be used for <br />cleaning process water from the plant. Location may change to the <br />reservoir floor once that area is mined. <br />16. In Phase 2 along the river, mining will occure within 300 feet of the top <br />of bank and backfilled with on-site material so there is a 300 foot wide <br />setback. No more then 500 feet of backfill area will be open at <br />any -one-time. <br />OWNER.- FPI <br />UWJVCIC. t'fiLUlvinv, ✓t l I <br />& PAL OMBO, KENDRA M <br />OWNER.- PUBLICSER VICE COMPA NY OF COL ORA D 0 <br />& Kim Y& Raymond SHoustorr <br />Ft. L. G. EVERIST, INC <br />SCALE 1"=300' <br />cL� a��s <br />DIVIIG S9AFE-fY- <br />N11N1tdG &` <br />Map Exhibit C-1 - MINING PLAN MAP <br />JUL 06, 2023 - 11:59:05 <br />