My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-07-13_GENERAL DOCUMENTS - C1981048
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981048
>
1995-07-13_GENERAL DOCUMENTS - C1981048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 2:43:09 PM
Creation date
2/27/2023 9:23:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
7/13/1995
Doc Name Note
Trinidad Basin Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> C-81-048 Trinidad Basin Mining Co. Trinidad Basin <br /> Type of Mine-Coal -Open Pit with augering Commodity Mined - Coal <br /> PRE-RECLAMATION SITE CONDITIONS <br /> Site conditions left by the operator were generally good, however immediately prior to second phase bond release, a large <br /> storm event damaged areas reclaimed by the operator. Most of the work was repair, or maintenance type work, except pond <br /> 15-P10, which was not approved as permanent. Coal accumulation of up to 3 ft, at the Linden Avenue loadout, resulted in <br /> drainage across the main RR tracks causing washout of tops and other maintenance problems. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Documented Quote <br /> (underline one) Formal Bid as part of the Trinidad Basin Mining Project, MVC-MINES-348 <br /> PO Number Contractor Name&Address Construction Bond Amount <br /> Dates <br /> Kessler Reclamation $122,000.00 <br /> PO Date P.O. Box 41 Start: 5/19/95 <br /> Rockvale, CO 81244 Project Cost <br /> End: 7/13/95 <br /> $82,163.00 <br /> Construction Work Description <br /> Construction work on the Trinidad Basin Mining Reclamation Project consisted of the following: <br /> -Regrading of the Linden Avenue coal loadout (within Trinidad city limits); <br /> -Realignment of 550 ft of stream channel in Sec. 15,T31 S, R65W (inc. 200' riprap); <br /> -Pond removal (Pond 15-P10); <br /> -Pond reconstruction (Pond 22-P10); <br /> -Ditch repair(400 ft), ditch removal (500 ft),culvert installation (2) and rock swale construction; <br /> -Bridge Reconstruction, Inc., storm water spillway; <br /> -Spillway reconstruction, ponds 15-P12, 15-P20, 22 P4; <br /> -Clean out of Pond 15-P20 <br /> -Revegetation of all disturbed areas except the coal load out(more or less 4 acres). <br /> Remaining Reclamation Requirements and Estimated Cost <br /> None <br /> m:\imp\yjb\trinidad.clo <br />
The URL can be used to link to this page
Your browser does not support the video tag.