My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-01_REVISION - M1983194 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2023-02-01_REVISION - M1983194 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2023 8:34:50 PM
Creation date
2/1/2023 9:15:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Revision
Doc Date
2/1/2023
Doc Name
Request for Technical Revision
From
Daub & Associates, Inc.
To
DRMS
Type & Sequence
TR50
Email Name
ACY
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1985'/2 SOUTH BROADWAY <br /> DAUB & ASSOCIATES, INC. i` GRAND JUNCTION,CO 81507-9649 <br /> (970)254-1224 <br /> FAX(970)242-8438 <br /> email: gjdaub@daubandassociates.com <br /> www.daubandassociates.com <br /> January 27, 2023 <br /> RECEIVED <br /> Mr. Travis Marshall <br /> Division of Reclamation, Mining and Safety FEBQ 1 <br /> ZM <br /> Room 215, c/o: Minerals Division <br /> 1001 E 62Id Ave. 0ivt, OF RECLAIWATI <br /> Denver, CO 80216 1**0 a SAFETY44WERALS <br /> Re: Natural Soda LLC Nahcolite Project Permit No. M-1983-194 Request for a Technical <br /> Revision for Drilling and Completion of 181-1-1V and 18H-IR-W Production Wells and Bond <br /> Recalculation for Plugged and Abandoned (P&A'd)Wells and Reduction of Disturbed <br /> Acreage <br /> Dear Travis, <br /> Natural Soda LLC (NS) hereby submits a request to drill and complete the 18H-1V and <br /> 18H-IR-W production wells. The 181-1-1V will be located on a new pad to be built in the southern <br /> portion of the NS Federal Sodium Lease and will require a new pipeline. The pipeline will <br /> require an access road running south from the existing road near DS-3 to the proposed 181-1-1V <br /> pad. The road will be 12 feet wide and graveled to allow pickup truck access for installation, <br /> maintenance, and monitoring of the pipeline. The total road disturbance will be approximately <br /> 0.5 acres. The 18H-IR-W will be drilled on a new location extending from the existing 15-17 <br /> pad. <br /> NS further notes that, pursuant to DRMS's September 20, 2022 Site Inspection and NS's MoU <br /> to the DRMS dated November 3, 2022, any CIRCES update should recognize and account for <br /> all recently P&A'd wells and a 5.483 acre bond reduction for well pads that the DRMS has <br /> recognized no longer disturbed. <br /> Please find attached: <br /> 1) DRMS Form — Request for TR Cover Sheet <br /> 2) Location Map <br /> 3) Proposed Well Completion Diagrams <br /> 4) Plat, cut and fill diagrams and location photos <br /> 5) Check number�7V 33 in the amount of$1,006.00 <br /> SPECIALIZING IN PROFESSIONAL GEOLOGICAL, ENVIRONMENTAL, HYDROLOGICAL, GEOTECHNICAL AND PERMITTING SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.