My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-13_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2023-01-13_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 8:54:06 PM
Creation date
1/13/2023 1:55:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
1/13/2023
Doc Name Note
Notice of Cable Re-Route
Doc Name
Addendum To Application
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR34
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Climax Molybdenum Climax Mine <br /> ® Highway 91 - Fremont Pass <br /> A Free ort-McMoRan Co m Climax, CO 80429 <br /> p WEIVE� Phone (719) 486-7718 <br /> Fax (719) 486-2251 <br /> JAN 13 2023 <br /> January 5, 2023 <br /> DIVISION OF MINING AND SAFETY o <br /> Mr. Dustin Czapla <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining and Safety <br /> Department of Natural Resources <br /> 1001 E 62nd Ave., Room 215 <br /> Denver, Colorado 80216 <br /> [via electronic mail] <br /> RE: Climax Mine, Permit No. M-1977-493, MRWTP 25kV Power Cable Re-route <br /> Notification <br /> Mr. Czapla, <br /> The purpose of this notification is to inform the Division of a modification to an existing buried <br /> power cable route at Climax's water treatment facilities. As part of earthwork activities involved in <br /> construction of Climax's Moly Removal Water Treatment Plant (MRWTP) (approved via Technical <br /> Revision TR-34), Climax plans to re-route the existing power supply as described below and as <br /> depicted on the attached figures. <br /> The re-route involves the following: <br /> • The existing buried 25 kV power line routed along the north side of the existing Property <br /> Discharge Water Treatment Plant (PDWTP)will be largely abandoned. The power cable <br /> will be removed from the existing buried conduit and the conduit will be abandoned in place. <br /> See Figure 1 for the location of the abandoned power cable conduit. <br /> • At the west end of the PDWTP project site, a new 25 kV power cable will be buried as <br /> depicted on Figure 2. It will transition to overhead near the intersection with the Old <br /> Highway 91. Four new overhead power poles will be required to route the new line to the <br /> existing power poles located along Old Highway 91. From there, the new power cable will <br /> utilize existing power poles until it meets the existing transformer near the Events Pond on <br /> the east side of the MRWTP project area. <br /> Please note that no new disturbance is anticipated as part of this power cable re-route. All earthwork <br /> to install the buried portion and four new power poles is located within previous disturbed lands (as <br /> approved under TR-19). No impacts to undisturbed lands or wetlands in the area are planned. This <br /> change will be included in the as-builts and certification that will be sent to DRMS once the project <br /> is completed as required by TR-34. <br />
The URL can be used to link to this page
Your browser does not support the video tag.