My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-05_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2023-01-05_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 11:20:07 AM
Creation date
1/5/2023 11:19:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/5/2023
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Tri-State Generation and Transmission Association
Type & Sequence
RN8
Email Name
ZTT
AME
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />January 5, 2023 <br /> <br />Chris Gilbreath <br />Tri-State Generation and Transmission Association <br />1100 West 116th Avenue <br />Westminster, CO 80234 <br /> <br /> <br />Re: Proposed Decision <br /> Permit Renewal Application No. 8 (RN-8) <br /> Colowyo Coal Mine (Permit No. C-1981-019) <br /> <br /> <br />Dear Mr. Gilbreath: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package <br />for Permit Renewal No. 8 at the Colowyo Coal Mine. Notice of the proposed decision will be <br />published in the CO Mountain News Media - Craig Daily Press as soon as possible. The thirty (30) <br />day public comment period for the Division's decision will begin on the day following the first <br />publication. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved renewal <br />materials were sent to the Office of Surface Mining and the Bureau of Land Management. The <br />materials should be sent within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. <br />However, if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to <br />your existing bond that equals or exceeds the Revised Liability. The permit will not be issued until <br />the Division has received and approved the bond. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division.
The URL can be used to link to this page
Your browser does not support the video tag.