My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-12-07_REVISION - C1981041 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2022-12-07_REVISION - C1981041 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2022 9:42:30 AM
Creation date
12/7/2022 9:41:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/7/2022
Doc Name
Issuance Letter
From
DRMS
To
Snowcap Coal Company, Inc
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />December 7, 2022 <br /> <br />Tonya Hammond <br />Snowcap Coal Company, Inc <br />P.O. Box 1430 <br />Palisade, CO 81526 <br /> <br /> <br />Re: Permit Issuance <br /> Permit Renewal Application No. 8 (RN-8) <br /> Roadside Portals (Permit No. C-1981-041) <br /> <br /> <br />Dear Ms. Hammond: <br /> <br />The Division of Reclamation, Mining and Safety's Proposed Decision to approve Permit Renewal <br />No. 8 at the Roadside Portals became final on December 3, 2022. Notice of the proposed decision <br />was published in the The Daily Sentinel on November 2, 2022, initiating the thirty (30) day public <br />comment period for the Division's decision. No requests for a formal hearing were received during <br />the comment period. <br /> <br />Enclosed you will find two signed Colorado Division of Reclamation, Mining and Safety Mining <br />Permit documents. An authorized representative of Snowcap Coal Company, Inc needs to sign both <br />documents and have them notarized. One must be returned to the Division at the above address; the <br />other must be kept on file at the mine office. <br /> <br />Please be aware that issuance of the permit renewal will initiate time frames of any enclosed <br />stipulations to the permit. Stipulations are enclosed in a rider to the permit, if any were imposed upon <br />the permit. All other enclosed commitments are also in effect as of the permit issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.